Quotation Estimate Carpenter in Bangladesh Dhaka –Free Word Template Download with AI
Dhaka Craft & Woodworks Ltd.
House 42, Road 11, Banani, Bangladesh Dhaka 1213
Phone: +880-2-8812345 | Email: [email protected]
VAT Registration No.: 001234567-0201
1. Client Information| Client Name: | Mr. Rafiqul Islam |
| Address: | Flat 7B, Gulshan Avenue, Block C, Bangladesh Dhaka 1212 |
| Contact Number: | +880-1711-234567 |
| Project Location: | Residential Apartment, Gulshan, Bangladesh Dhaka |
This Quotation Estimate is prepared by Dhaka Craft & Woodworks Ltd. to provide comprehensive Carpenter services for the residential renovation project located in Bangladesh Dhaka. Our team of experienced Carpenter professionals will execute all woodwork, furniture fabrication, and structural timber tasks as detailed below. The scope encompasses custom-built wardrobes, kitchen cabinetry, wooden flooring installation, door and window frame repairs, and decorative paneling throughout the three-bedroom apartment.
3. Itemized Cost Breakdown| Sl. No. | Description of Carpenter Work | Unit | Qty | Unit Rate (BDT) | Amount (BDT) |
|---|---|---|---|---|---|
| 1 | Custom-built 6-door wardrobe with teak wood (master bedroom) | Set | 1 | 85,000 | 85,000 |
| 2 | Custom-built 4-door wardrobe (second bedroom) | Set | 1 | 62,000 | 62,000 |
| 3 | Kitchen cabinetry – base units and wall units (solid sheesham wood) | Set | 1 | 145,000 | 145,000 |
| 4 | Engineered teak wood flooring – living room and dining area (approx. 450 sq ft) | Sq Ft | 450 | 320 | 144,000 |
| 5 | Repair and refinishing of 4 main entrance and interior doors | Door | 4 | 8,500 | 34,000 |
| 6 | Wooden window frames – replacement of 6 damaged frames (sal wood) | Frame | 6 | 12,000 | 72,000 |
| 7 | Decorative wooden paneling – TV unit and hallway accent wall | Sq Ft | 120 | 450 | 54,000 |
| 8 | Study room desk with built-in shelving unit (mahogany finish) | Set | 1 | 48,000 | 48,000 |
| 9 | Bathroom vanity unit with wooden countertop (water-resistant treatment) | Set | 2 | 28,000 | 56,000 |
| 10 | General carpentry labor, site supervision, and finishing (paint, varnish, sanding) | Lot | 1 | 35,000 | 35,000 |
| Subtotal: | 735,000 | ||||
| VAT (5% as applicable in Bangladesh Dhaka): | 36,750 | ||||
| Grand Total (BDT): | 771,750 | ||||
The Carpenter team assigned to this project in Bangladesh Dhaka estimates a total duration of 28 working days from the date of material approval. The schedule includes 5 days for material procurement and site preparation, 18 days for fabrication and installation, and 5 days for finishing, quality inspection, and final handover. All work will be conducted between 8:00 AM and 6:00 PM to minimize disruption to the client's household.
5. Terms and Conditions- This Quotation Estimate is valid for 30 calendar days from the date of issue. Prices are subject to revision after the validity period due to fluctuating timber costs in the Bangladesh Dhaka market.
- A 40% advance payment is required to confirm the order and initiate material procurement. The remaining 60% shall be payable upon completion and client sign-off.
- All wood materials sourced for this Carpenter project will be certified and free from termites, in compliance with Bangladesh Forest Department regulations.
- The Carpenter team will provide a 12-month warranty on all structural woodwork and 6-month warranty on finishing work (paint, varnish, hardware).
- Any additional work or design modifications requested after the initial scope approval will be quoted separately and require written consent from the client.
- The contractor is responsible for all safety measures on-site in accordance with the Bangladesh Labour Act 2006 and local municipal by-laws of Bangladesh Dhaka.
- Disputes arising from this Quotation Estimate shall be resolved through amicable negotiation, failing which they shall be subject to the jurisdiction of the courts in Bangladesh Dhaka.
| Milestone | Percentage | Amount (BDT) | Due Date |
|---|---|---|---|
| Advance (upon order confirmation) | 40% | 308,700 | Within 3 days of approval |
| Mid-project (after flooring and cabinetry installation) | 30% | 231,525 | Day 15 of project |
| Final (upon completion and handover) | 30% | 231,525 | Day 28 of project |
By signing below, the client acknowledges and accepts this Quotation Estimate for Carpenter services in Bangladesh Dhaka as presented by Dhaka Craft & Woodworks Ltd. The client confirms that all specifications, timelines, and financial terms have been reviewed and agreed upon.
For Dhaka Craft & Woodworks Ltd.Authorized Signatory
Name: Md. Abdul Karim
Designation: Project Manager Client Acceptance
Name: Mr. Rafiqul Islam
Signature & Date: _______________ ⬇️ Download as DOCX Edit online as DOCX
Create your own Word template with our GoGPT AI prompt:
GoGPT