Quotation Estimate Carpenter in Morocco Casablanca –Free Word Template Download with AI
This Quotation Estimate is issued by Ateliers du Bois Casablanca, a licensed and insured Carpenter workshop operating in the heart of Morocco Casablanca. We are pleased to present this detailed cost breakdown for the carpentry services requested by the client. Our team of experienced Carpenter professionals has assessed the project requirements and prepared this Quotation Estimate to provide full transparency regarding all labor, materials, and associated costs. All work will be executed in compliance with Moroccan building regulations and the specific standards applicable to the Morocco Casablanca metropolitan area.
The scope of work outlined in this Quotation Estimate encompasses custom furniture fabrication, interior wood paneling, door and window frame installation, and structural timber reinforcement. Our Carpenter crew will mobilize to the designated site within Morocco Casablanca and complete all phases within the agreed timeline. This Quotation Estimate reflects current market pricing for skilled Carpenter labor and premium-grade timber materials sourced from certified suppliers in the Casablanca region.
2. Itemized Cost Breakdown| # | Description of Carpenter Work | Quantity | Unit (MAD) | Total (MAD) | Notes |
|---|---|---|---|---|---|
| 1 | Custom oak dining table (220 cm) with 6 matching chairs — Carpenter fabrication | 1 set | 18,500 | 18,500 | French oak, hand-finished |
| 2 | Interior wood paneling for living room walls (approx. 45 m²) | 45 m² | 850 | 38,250 | Cedar panels, installed by Carpenter team |
| 3 | Installation of 4 solid wood interior doors with frames | 4 units | 4,200 | 16,800 | Includes hardware and sealing |
| 4 | Built-in wardrobe system (3.2 m wide, 2.4 m high) — Carpenter assembly | 1 unit | 22,000 | 22,000 | MDF core, walnut veneer finish |
| 5 | Structural timber beam reinforcement, ceiling area | 6 beams | 3,500 | 21,000 | Pine structural grade, treated |
| 6 | Custom kitchen cabinetry (L-shape, 4.5 m run) | 1 set | 32,000 | 32,000 | Hardwood, soft-close mechanisms |
| 7 | Site preparation, material transport within Morocco Casablanca, and cleanup | 1 lot | 5,500 | 5,500 | Coverage of Casablanca city limits |
| 8 | Final inspection, quality assurance, and 12-month warranty registration | 1 lot | 2,500 | 2,500 | Certified Carpenter sign-off |
| Subtotal (MAD) | 156,550 | ||||
| VAT (20%) — Morocco Casablanca jurisdiction | 31,310 | ||||
| TOTAL AMOUNT DUE (MAD) | 187,860 | ||||
As outlined in this Quotation Estimate, payment for the Carpenter services shall be structured as follows:
| Milestone | Percentage | Amount (MAD) | Due Date |
|---|---|---|---|
| Contract signing & material procurement | 40% | 75,144 | Upon acceptance of this Quotation Estimate |
| Mid-project (Carpenter work 50% complete) | 35% | 65,751 | Week 3 of execution |
| Final delivery & inspection sign-off | 25% | 46,965 | Upon completion in Morocco Casablanca |
The Carpenter team will commence work on the agreed start date and is projected to complete all phases within five (5) working weeks. The schedule accounts for material delivery times within the Morocco Casablanca supply chain, fabrication in our workshop, on-site installation, and final finishing. Any delays caused by force majeure or client-requested design changes will be communicated in writing and may result in an amended Quotation Estimate.
5. Terms & Conditions- This Quotation Estimate is valid for thirty (30) calendar days from the date of issue. After this period, pricing for Carpenter labor and materials may be revised to reflect current market conditions in Morocco Casablanca.
- All work performed by our Carpenter professionals is covered by a twelve (12) month workmanship warranty from the date of final acceptance.
- The client is responsible for ensuring the site in Morocco Casablanca is accessible, safe, and free of obstructions prior to the Carpenter team's arrival.
- Any additional work or design modifications requested after the initial Quotation Estimate has been accepted will be subject to a supplementary quotation and written approval before execution.
- Payment is due within ten (10) business days of each milestone invoice. Late payments shall incur a penalty of 1.5% per month as per Moroccan commercial law.
- This Quotation Estimate does not constitute a binding contract until countersigned by both parties. The Carpenter services described herein are subject to availability of specified materials.
- All disputes arising from this Quotation Estimate shall be resolved under the jurisdiction of the courts of Morocco Casablanca.
- Our Carpenter team complies with all occupational health and safety regulations in force in Morocco. The client shall be notified of any site-specific safety requirements prior to commencement.
By signing below, the client acknowledges receipt of this Quotation Estimate for Carpenter services in Morocco Casablanca and agrees to the terms, conditions, and pricing outlined herein. This signature authorizes Ateliers du Bois Casablanca to proceed with material procurement and scheduling of the Carpenter crew.
Client Signature & DateName: _________________________ Ateliers du Bois Casablanca — Authorized Representative
Name: Youssef El Amrani, Lead Carpenter
Date: _________________________ ⬇️ Download as DOCX Edit online as DOCX
Create your own Word template with our GoGPT AI prompt:
GoGPT