Quotation Estimate Electrical Engineer in Myanmar Yangon –Free Word Template Download with AI
Golden Circuit Engineering Co., Ltd.
25, No. 128 Street, Hledan Township, Myanmar Yangon
Tel: +95-9-795-123-456 | Email: [email protected]
Company Reg. No: 2019012345 | TIN: 345678901
1. Purpose and Scope of This Quotation EstimateThis Quotation Estimate is issued by Golden Circuit Engineering Co., Ltd. to provide a comprehensive and itemized cost breakdown for the professional services of a licensed Electrical Engineer to be deployed at the Sule Tower commercial development project located in the heart of Myanmar Yangon. This document serves as a formal Quotation Estimate outlining all deliverables, labor costs, equipment charges, and associated expenses for the electrical design, installation supervision, and commissioning phases of the project. The Electrical Engineer engaged under this Quotation Estimate shall hold a valid Myanmar Engineering Council (MEC) license and possess a minimum of fifteen (15) years of experience in commercial and high-rise building electrical systems within Myanmar Yangon and the broader Myanmar region.
2. Detailed Line Items – Quotation Estimate Breakdown| No. | Description of Service / Item | Quantity | Unit | Unit Price (MMK) | Total Price (MMK) |
|---|---|---|---|---|---|
| 1 | Senior Electrical Engineer – Full-time on-site supervision for electrical design review, load calculations, and single-line diagram preparation for the 18-story Sule Tower project in Myanmar Yangon | 1 | Person | 4,500,000 | 4,500,000 |
| 2 | Electrical Engineer – Design of low-voltage distribution system, lighting circuits, power outlets, and emergency backup generator interconnection per Myanmar Electrical Code and IEC standards | 1 | Lump Sum | 12,000,000 | 12,000,000 |
| 3 | Electrical Engineer – Fire alarm system, emergency lighting, and smoke detection system design and coordination with civil and mechanical engineering teams in Myanmar Yangon | 1 | Lump Sum | 8,500,000 | 8,500,000 |
| 4 | Electrical Engineer – Commissioning, testing, and certification of all electrical installations including insulation resistance testing, earth continuity testing, and thermal imaging survey | 1 | Lump Sum | 6,800,000 | 6,800,000 |
| 5 | Electrical Engineer – Preparation of as-built drawings, operation and maintenance manuals, and final compliance report for submission to Yangon City Development Committee | 1 | Lump Sum | 3,200,000 | 3,200,000 |
| 6 | Specialized testing equipment rental (megger, thermal camera, power quality analyzer) for the duration of the project in Myanmar Yangon | 4 | Months | 1,200,000 | 4,800,000 |
| 7 | Travel, accommodation, and per diem allowance for the Electrical Engineer and two (2) assistant technicians stationed at the Myanmar Yangon project site | 4 | Months | 2,500,000 | 10,000,000 |
| 8 | Project management, coordination meetings, and progress reporting (bi-weekly) to the client in Myanmar Yangon | 1 | Lump Sum | 2,000,000 | 2,000,000 |
| SUBTOTAL | 51,800,000 | ||||
| VAT (5% – Myanmar Standard Rate) | 2,590,000 | ||||
| GRAND TOTAL (Quotation Estimate) | 54,390,000 MMK | ||||
- This Quotation Estimate is valid for a period of thirty (30) calendar days from the date of issue. Any request for services beyond this validity period shall require a revised Quotation Estimate from Golden Circuit Engineering Co., Ltd.
- Payment shall be made in Myanmar Kyat (MMK) via bank transfer to the company account at CB Bank, Hledan Branch, Myanmar Yangon. Payment schedule: 30% advance upon contract signing, 40% upon completion of design and installation supervision, and 30% upon final commissioning and handover.
- The Electrical Engineer assigned to this project shall report to the client's site manager five (5) days per week, from 8:00 AM to 5:00 PM, Monday through Friday, in accordance with standard working hours in Myanmar Yangon.
- All electrical designs and engineering deliverables shall comply with the Myanmar Electrical Code, Myanmar Building Code, and applicable International Electrotechnical Commission (IEC) standards. The Electrical Engineer shall ensure full compliance with regulations set by the Ministry of Electric Power and Energy, Republic of the Union of Myanmar.
- Any changes in scope, additional work orders, or modifications to the original project specifications in Myanmar Yangon shall be subject to a supplementary Quotation Estimate and written approval from both parties before execution.
- The Electrical Engineer and all supporting personnel shall be covered under the company's professional indemnity insurance and workers' compensation policy as mandated by Myanmar labor law.
- Confidentiality: All project data, architectural drawings, and proprietary information shared in connection with this Quotation Estimate and subsequent contract shall be treated as strictly confidential by both parties.
- Disputes arising from this Quotation Estimate or the resulting contract shall be resolved through amicable negotiation. If unresolved, the matter shall be referred to arbitration under the Myanmar Arbitration Law in Myanmar Yangon.
| Phase | Duration | Key Deliverable |
|---|---|---|
| Design & Load Calculation | Weeks 1–4 | Approved electrical design package by the Electrical Engineer |
| Installation Supervision | Weeks 5–12 | Weekly progress reports and site inspection logs |
| Commissioning & Testing | Weeks 13–16 | Test certificates and commissioning report |
| Handover & Documentation | Week 17 | As-built drawings, O&M manuals, and final compliance certificate |
For and on behalf of:
Golden Circuit Engineering Co., Ltd.
Dr. Thura Win Aung
Chief Electrical Engineer / Director
MEC License No: EE-2003-0456
Date: _______________
Accepted by (Client):
Sule Tower Development Ltd.
Mr. Aung Kyaw Min
Director
TIN: _______________
Date: _______________
⬇️ Download as DOCX Edit online as DOCXCreate your own Word template with our GoGPT AI prompt: