GoGPT GoSearch New DOC New XLS New PPT

OffiDocs favicon

Quotation Estimate Electrical Engineer in Tanzania Dar es Salaam –Free Word Template Download with AI

Professional Electrical Engineering & Consultancy Services

P.O. Box 12456, Mbezi Beach Road, Kariakoo, Dar es Salaam, Tanzania

Tel: +255 754 123 456 | Email: [email protected]

TIN: 123-456-789 | PRA License No: TZ/EE/2024/0087

Quotation Estimate

Quotation Details

Quotation No: QTE-2025-0347

Date Issued: 15 June 2025

Valid Until: 15 July 2025

Project Location: Tanzania Dar es Salaam

Client Information

Client Name: Mwanza Industrial Park Ltd.

Address: Plot 45, Industrial Area, Dar es Salaam, Tanzania

Contact Person: Eng. Amina Hassan

Email: [email protected]

Dear Eng. Amina Hassan,

Thank you for your inquiry regarding professional Electrical Engineer services for the Mwanza Industrial Park expansion project. We are pleased to present this Quotation Estimate for comprehensive electrical engineering consultancy, design, and supervision services to be delivered in Tanzania Dar es Salaam. Our team of certified Electrical Engineer professionals has extensive experience working on industrial, commercial, and residential electrical infrastructure projects across the Dar es Salaam region and the broader Tanzania market.

This Quotation Estimate covers the full scope of Electrical Engineer services required for the design, installation supervision, and commissioning of the electrical systems at your facility in Tanzania Dar es Salaam. The services include power distribution design, lighting systems, earthing and lightning protection, fire alarm systems, and low-voltage electrical installations in compliance with the Tanzania Energy and Water Utilities Authority (EWURA) regulations and the Tanzania Building Code.

No. Description of Electrical Engineer Service Unit Quantity Unit Rate (TZS) Amount (TZS)
1 Site survey and load assessment by a senior Electrical Engineer in Tanzania Dar es Salaam Lump Sum 1 1,850,000 1,850,000
2 Electrical single-line diagram and power distribution design (Electrical Engineer consultancy) Lump Sum 1 4,200,000 4,200,000
3 Lighting layout design and energy efficiency analysis (Electrical Engineer service) Lump Sum 1 2,750,000 2,750,000
4 Earthing, bonding, and lightning protection system design Lump Sum 1 1,950,000 1,950,000
5 Fire alarm and emergency power system design (Electrical Engineer scope) Lump Sum 1 3,400,000 3,400,000
6 Installation supervision and quality assurance – on-site Electrical Engineer (per week) Week 8 2,200,000 17,600,000
7 Commissioning, testing, and final inspection report (Electrical Engineer certification) Lump Sum 1 2,500,000 2,500,000
8 As-built documentation and handover package preparation Lump Sum 1 1,200,000 1,200,000
9 Travel and accommodation for Electrical Engineer team within Tanzania Dar es Salaam Lump Sum 1 1,500,000 1,500,000
10 EWURA compliance review and regulatory submission support Lump Sum 1 950,000 950,000
Subtotal (TZS) 37,900,000
VAT @ 18% 6,822,000
TOTAL AMOUNT (TZS) 44,722,000
  • This Quotation Estimate is valid for thirty (30) calendar days from the date of issue. After the expiry date, prices may be revised to reflect current market conditions in Tanzania Dar es Salaam.
  • All Electrical Engineer services shall be performed in strict compliance with the Tanzania Energy and Water Utilities Authority (EWURA) standards, the Tanzania Building Code, and IEC international standards.
  • Payment terms: 40% advance payment upon acceptance of this Quotation Estimate, 40% upon completion of design and mid-project supervision, and 20% upon final commissioning and handover.
  • The Electrical Engineer team assigned to this project shall include a Lead Electrical Engineer (minimum 10 years experience), two (2) Assistant Electrical Engineers, and one (1) Electrical Technician.
  • All work shall be carried out at the client's premises in Tanzania Dar es Salaam during standard working hours (Monday to Friday, 08:00–17:00 EAT), unless otherwise agreed in writing.
  • Any additional scope beyond what is described in this Quotation Estimate shall be subject to a separate written amendment and additional cost assessment.
  • The client shall provide safe access to the site, necessary permits, and coordination with other contractors operating in Tanzania Dar es Salaam.
  • Disputes arising from this engagement shall be resolved through arbitration in Dar es Salaam in accordance with the Tanzania Arbitration Act, Cap. 20, Laws of Tanzania.
  • All intellectual property, design drawings, and documentation produced by our Electrical Engineer team shall become the property of the client upon full payment.

By signing below, the client acknowledges and accepts this Quotation Estimate for Electrical Engineer services in Tanzania Dar es Salaam as presented above, including all terms and conditions stated herein.

For Tanzania Power Solutions Ltd.
Name: Eng. Joseph Mwakalinga
Title: Lead Electrical Engineer / Managing Director
Signature & Date: _________________________
For Mwanza Industrial Park Ltd. (Client)
Name: Eng. Amina Hassan
Title: Project Manager
Signature & Date: _________________________

This Quotation Estimate was prepared by Tanzania Power Solutions Ltd., a registered Electrical Engineer consultancy firm operating in Tanzania Dar es Salaam.

Document Reference: QTE-2025-0347 | Page 1 of 1 | Confidential – For Client Use Only

⬇️ Download as DOCX Edit online as DOCX

Create your own Word template with our GoGPT AI prompt:

GoGPT
×
Advertisement
❤️Shop, book, or buy here — no cost, helps keep services free.