Quotation Estimate Electrician in Indonesia Jakarta –Free Word Template Download with AI
Professional Electrician Services — Indonesia Jakarta
Service Provider
Jakarta Power Solutions PT
Address: Jl. Jend. Sudirman Kav. 45, SCBD
South Jakarta, Indonesia Jakarta 12190
Tel: +62 21 5550 1234
Email: [email protected]
NPWP: 01.234.567.8-011.000
Client / Recipient
PT Nusantara Building Management
Address: Menara Nusantara, Lt. 12
Jl. H.R. Rasuna Said, Kuningan
South Jakarta, Indonesia Jakarta 12950
Attn: Mr. Budi Santoso, Facilities Manager
Tel: +62 21 5200 8877
This Quotation Estimate is issued by Jakarta Power Solutions PT, a licensed and certified Electrician service provider operating across Indonesia Jakarta, to provide a comprehensive breakdown of costs for the electrical installation, inspection, and maintenance works required at the client's premises. All work shall be performed in strict compliance with the Indonesian National Standard (SNI 0225) for electrical installations and the regulations set forth by the local Indonesia Jakarta electrical authority (Dinas ESDM DKI Jakarta).
| No. | Description of Electrician Work | Unit | Qty | Unit Price (IDR) | Subtotal (IDR) |
|---|---|---|---|---|---|
| 1 | Complete electrical panel replacement (3-phase, 400A main distribution board) including all circuit breakers, busbars, and labeling | Lot | 1 | 48,500,000 | 48,500,000 |
| 2 | Installation of 120 new lighting fixtures (LED, 40W) across floors 10–14, including wiring, conduits, and mounting | Unit | 120 | 1,850,000 | 222,000,000 |
| 3 | Replacement of 85 power outlets and data sockets (Type C & RJ45) with certified wiring | Unit | 85 | 950,000 | 80,750,000 |
| 4 | Installation of 6 new 3-phase air conditioning power circuits (16A dedicated lines) with thermal protection | Circuit | 6 | 7,200,000 | 43,200,000 |
| 5 | Thermal imaging inspection and full diagnostic report of existing electrical infrastructure (floors 1–15) | Lot | 1 | 12,000,000 | 12,000,000 |
| 6 | Emergency lighting and exit sign installation (28 units) with battery backup system | Unit | 28 | 2,400,000 | 67,200,000 |
| 7 | Earthing and lightning protection system upgrade (grounding grid, surge arresters, and bonding) | Lot | 1 | 35,000,000 | 35,000,000 |
| 8 | Commissioning, load testing, and issuance of SNI compliance certificate for the Indonesia Jakarta building authority | Lot | 1 | 8,500,000 | 8,500,000 |
| 9 | Project supervision by a senior Electrician engineer (full-time on-site, 25 working days) | Day | 25 | 1,500,000 | 37,500,000 |
| 10 | Waste disposal, site cleanup, and temporary power supply during construction phase | Lot | 1 | 6,000,000 | 6,000,000 |
| Subtotal | 660,650,000 | ||||
| VAT (PPN) 11% | 72,671,500 | ||||
| TOTAL QUOTATION ESTIMATE AMOUNT | 733,321,500 | ||||
- This Quotation Estimate is valid for a period of thirty (30) calendar days from the date of issue. Any work commenced after the expiry date shall be subject to re-evaluation of material and labor costs applicable in Indonesia Jakarta at that time.
- All Electrician personnel deployed by Jakarta Power Solutions PT hold valid K3 (Keselamatan dan Kesehatan Kerja) certifications and are registered with the Indonesian Electrical Engineers Association (IATMI) for the Indonesia Jakarta region.
- Payment terms: 40% advance upon signing of the work order, 40% upon completion of 70% of the scope, and 20% upon final acceptance and handover of the SNI compliance certificate. All payments shall be made via bank transfer to the account specified in the attached invoice.
- The project timeline is estimated at twenty-five (25) working days from the date of mobilization, subject to weather conditions and client access availability in Indonesia Jakarta.
- All materials and equipment supplied shall carry a minimum two-year manufacturer warranty. The Electrician workmanship is guaranteed for a period of twelve (12) months from the date of final acceptance.
- Any changes to the scope of work beyond 10% of the original Quotation Estimate value shall require a written variation order signed by both parties before additional work commences.
- This Quotation Estimate does not include any costs related to PLN (Perusahaan Listrik Negara) connection upgrades, permits from the Indonesia Jakarta municipal government beyond the SNI certificate, or structural modifications to the building.
- Disputes arising from this agreement shall be resolved through mediation in Indonesia Jakarta in accordance with the laws of the Republic of Indonesia.
By signing below, the client acknowledges and accepts this Quotation Estimate for Electrician services to be performed in Indonesia Jakarta as described herein. This document, once countersigned, constitutes a binding agreement between both parties for the scope, pricing, and terms outlined above.
For and on behalf of:
Jakarta Power Solutions PT
Position: Chief Electrician / Director
Signature & Company Stamp
For and on behalf of:
PT Nusantara Building Management
Position: Facilities Manager
Signature & Company Stamp ⬇️ Download as DOCX Edit online as DOCX