GoGPT GoSearch New DOC New XLS New PPT

OffiDocs favicon

Quotation Estimate Electrician in Indonesia Jakarta –Free Word Template Download with AI

Professional Electrician Services — Indonesia Jakarta

Service Provider

Jakarta Power Solutions PT

Address: Jl. Jend. Sudirman Kav. 45, SCBD

South Jakarta, Indonesia Jakarta 12190

Tel: +62 21 5550 1234

Email: [email protected]

NPWP: 01.234.567.8-011.000

Client / Recipient

PT Nusantara Building Management

Address: Menara Nusantara, Lt. 12

Jl. H.R. Rasuna Said, Kuningan

South Jakarta, Indonesia Jakarta 12950

Attn: Mr. Budi Santoso, Facilities Manager

Tel: +62 21 5200 8877

Quotation Estimate No.:QTE-JKT-2025-00487
Date of Issue:14 June 2025
Valid Until:14 July 2025 (30 calendar days)
Project Location:Indonesia Jakarta — South Jakarta District
Service Category:Commercial Electrician Installation & Maintenance
Currency:Indonesian Rupiah (IDR)

This Quotation Estimate is issued by Jakarta Power Solutions PT, a licensed and certified Electrician service provider operating across Indonesia Jakarta, to provide a comprehensive breakdown of costs for the electrical installation, inspection, and maintenance works required at the client's premises. All work shall be performed in strict compliance with the Indonesian National Standard (SNI 0225) for electrical installations and the regulations set forth by the local Indonesia Jakarta electrical authority (Dinas ESDM DKI Jakarta).

No. Description of Electrician Work Unit Qty Unit Price (IDR) Subtotal (IDR)
1 Complete electrical panel replacement (3-phase, 400A main distribution board) including all circuit breakers, busbars, and labeling Lot 1 48,500,000 48,500,000
2 Installation of 120 new lighting fixtures (LED, 40W) across floors 10–14, including wiring, conduits, and mounting Unit 120 1,850,000 222,000,000
3 Replacement of 85 power outlets and data sockets (Type C & RJ45) with certified wiring Unit 85 950,000 80,750,000
4 Installation of 6 new 3-phase air conditioning power circuits (16A dedicated lines) with thermal protection Circuit 6 7,200,000 43,200,000
5 Thermal imaging inspection and full diagnostic report of existing electrical infrastructure (floors 1–15) Lot 1 12,000,000 12,000,000
6 Emergency lighting and exit sign installation (28 units) with battery backup system Unit 28 2,400,000 67,200,000
7 Earthing and lightning protection system upgrade (grounding grid, surge arresters, and bonding) Lot 1 35,000,000 35,000,000
8 Commissioning, load testing, and issuance of SNI compliance certificate for the Indonesia Jakarta building authority Lot 1 8,500,000 8,500,000
9 Project supervision by a senior Electrician engineer (full-time on-site, 25 working days) Day 25 1,500,000 37,500,000
10 Waste disposal, site cleanup, and temporary power supply during construction phase Lot 1 6,000,000 6,000,000
Subtotal 660,650,000
VAT (PPN) 11% 72,671,500
TOTAL QUOTATION ESTIMATE AMOUNT 733,321,500
  1. This Quotation Estimate is valid for a period of thirty (30) calendar days from the date of issue. Any work commenced after the expiry date shall be subject to re-evaluation of material and labor costs applicable in Indonesia Jakarta at that time.
  2. All Electrician personnel deployed by Jakarta Power Solutions PT hold valid K3 (Keselamatan dan Kesehatan Kerja) certifications and are registered with the Indonesian Electrical Engineers Association (IATMI) for the Indonesia Jakarta region.
  3. Payment terms: 40% advance upon signing of the work order, 40% upon completion of 70% of the scope, and 20% upon final acceptance and handover of the SNI compliance certificate. All payments shall be made via bank transfer to the account specified in the attached invoice.
  4. The project timeline is estimated at twenty-five (25) working days from the date of mobilization, subject to weather conditions and client access availability in Indonesia Jakarta.
  5. All materials and equipment supplied shall carry a minimum two-year manufacturer warranty. The Electrician workmanship is guaranteed for a period of twelve (12) months from the date of final acceptance.
  6. Any changes to the scope of work beyond 10% of the original Quotation Estimate value shall require a written variation order signed by both parties before additional work commences.
  7. This Quotation Estimate does not include any costs related to PLN (Perusahaan Listrik Negara) connection upgrades, permits from the Indonesia Jakarta municipal government beyond the SNI certificate, or structural modifications to the building.
  8. Disputes arising from this agreement shall be resolved through mediation in Indonesia Jakarta in accordance with the laws of the Republic of Indonesia.

By signing below, the client acknowledges and accepts this Quotation Estimate for Electrician services to be performed in Indonesia Jakarta as described herein. This document, once countersigned, constitutes a binding agreement between both parties for the scope, pricing, and terms outlined above.

For and on behalf of:
Jakarta Power Solutions PT

Name: Ir. Hendra Wijaya, M.Eng.
Position: Chief Electrician / Director
Signature & Company Stamp

For and on behalf of:
PT Nusantara Building Management

Name: Budi Santoso
Position: Facilities Manager
Signature & Company Stamp
Important Note: This Quotation Estimate is prepared exclusively for the client named above and is non-transferable. All prices are quoted in Indonesian Rupiah (IDR) and are inclusive of all Electrician labor, tools, and standard materials unless otherwise stated. For any clarification or revision of this document, please contact our Indonesia Jakarta office at +62 21 5550 1234 or [email protected]. This Quotation Estimate No. QTE-JKT-2025-00487 is the final and binding version.
⬇️ Download as DOCX Edit online as DOCX

Create your own Word template with our GoGPT AI prompt:

GoGPT
×
Advertisement
❤️Shop, book, or buy here — no cost, helps keep services free.