GoGPT GoSearch New DOC New XLS New PPT

OffiDocs favicon

Quotation Estimate Electrician in Pakistan Islamabad –Free Word Template Download with AI

Professional Electrician Services — Pakistan Islamabad

Service Provider

Capital Electric Solutions (Pvt.) Ltd.
Plot 47, Blue Area, Jinnah Avenue
Islamabad, Pakistan
Phone: +92-51-227-XXXX
Email: [email protected]
NTN: 1234567-8
License No: IESCO-ELC-2024-0891

Client Details

Mr. Ahmed Raza Khan
House 112, Street 9, F-10/2
Islamabad, Pakistan
Phone: +92-300-XXXXXXX
Email: [email protected]
Property Type: Residential Villa (3 Floors)

Quotation No.:QTE-2025-0472
Date of Issue:15 June 2025
Valid Until:15 July 2025 (30 Days)
Project Location:F-10/2, Islamabad, Pakistan
Estimated Duration:12 Working Days

This Quotation Estimate is prepared by Capital Electric Solutions (Pvt.) Ltd., a licensed and certified Electrician firm operating in Pakistan Islamabad, for the comprehensive electrical installation, renovation, and maintenance of the client's residential property. All work shall be carried out in strict compliance with the Pakistan Electrical and Electronic Engineering Council (PEECC) standards, IESCO (Islamabad Electric Supply Company) regulations, and the National Building Code of Pakistan. Our team of qualified Electrician professionals will ensure that every aspect of the electrical work meets the highest safety and quality benchmarks required for residential properties in Pakistan Islamabad.

# Description of Electrician Work Quantity Unit Rate (PKR) Total Amount (PKR)
1 Complete rewiring of 3-floor residential villa (copper wiring, 2.5 sq mm and 4 sq mm) including all conduits, junction boxes, and distribution boards 1 Lot 485,000 485,000
2 Installation of 48 ceiling light fixtures, 24 wall switches, and 36 socket outlets (Schneider Electric / Legrand brand) 1 Lot 198,000 198,000
3 Supply and installation of 3-phase main distribution board with 24-way MCBs, RCD protection, and surge arrestor (IEC 60898 compliant) 1 Unit 87,500 87,500
4 Installation of 6 inverter/UPS backup systems (5 kVA each) with 12V 200Ah battery banks for critical loads 6 Units 62,000 372,000
5 Earthing and grounding system installation (copper rod, 25 sq mm earth wire, earth resistance < 5 ohms) as per Pakistan Islamabad utility requirements 1 Lot 54,000 54,000
6 Installation of 4 CCTV security cameras (4MP, night vision) with 2TB NVR, cabling, and configuration 1 Lot 145,000 145,000
7 Smart home automation: Wi-Fi controlled lighting, AC remote management, and door access system (3 floors) 1 Lot 210,000 210,000
8 Electrical safety inspection, thermal imaging scan, load balancing, and final IESCO compliance certification for Pakistan Islamabad 1 Lot 32,000 32,000
9 Labour charges for all Electrician technicians (6 technicians, 12 days) including site supervision and project management 1 Lot 168,000 168,000
10 Waste disposal, site cleanup, and final handover documentation including as-built electrical drawings 1 Lot 18,500 18,500
Subtotal PKR 1,770,000
GST (18% as per Pakistan Federal Tax Rules) PKR 318,600
Site Access & Logistics (Islamabad) PKR 12,000
Grand Total PKR 2,100,600
  1. This Quotation Estimate is valid for thirty (30) calendar days from the date of issue. After the expiry date, pricing may be revised due to fluctuating material costs in the Pakistan Islamabad market.
  2. Payment Terms: 40% advance payment upon acceptance of this Quotation Estimate, 40% upon completion of 70% of the Electrician work, and 20% upon final inspection and handover.
  3. All materials and components shall be of genuine, ISI-marked or internationally certified brands. The Electrician team shall provide original purchase invoices for all major equipment.
  4. The total project duration is estimated at twelve (12) working days, subject to weather conditions and client availability for access to the property in Pakistan Islamabad.
  5. A comprehensive two-year warranty is provided on all labour work. Manufacturer warranties apply to all supplied equipment and components.
  6. All electrical work shall be performed by licensed Electrician professionals registered with the Pakistan Electrical and Electronic Engineering Council (PEECC). No unlicensed personnel shall be deployed on site.
  7. The client shall ensure that all necessary NOCs from the housing authority (IHS - Islamabad Housing Society) and IESCO are obtained prior to commencement of work.
  8. Any additional work beyond the scope described in this Quotation Estimate shall be subject to a separate written amendment and additional cost approval by the client.
  9. In the event of force majeure (natural disasters, government-imposed restrictions, or utility outages exceeding 48 hours in Pakistan Islamabad), the project timeline shall be extended accordingly without penalty to either party.
  10. All disputes arising from this Quotation Estimate shall be resolved through arbitration in Islamabad, Pakistan, in accordance with the Arbitration Act of Pakistan.
For Capital Electric Solutions (Pvt.) Ltd.
Authorized Signatory / Chief Electrician
Name: Eng. Muhammad Tariq
Date: _______________
Client Acceptance
Name: Mr. Ahmed Raza Khan
Signature: _______________
Date: _______________

This Quotation Estimate document was prepared exclusively for the client named above for Electrician services in Pakistan Islamabad. This document is confidential and shall not be reproduced or distributed without written consent. Capital Electric Solutions (Pvt.) Ltd. — Serving Pakistan Islamabad with trusted electrical expertise since 2008.

⬇️ Download as DOCX Edit online as DOCX

Create your own Word template with our GoGPT AI prompt:

GoGPT
×
Advertisement
❤️Shop, book, or buy here — no cost, helps keep services free.