Quotation Estimate Electrician in Pakistan Islamabad –Free Word Template Download with AI
Professional Electrician Services — Pakistan Islamabad
Service Provider
Capital Electric Solutions (Pvt.) Ltd.
Plot 47, Blue Area, Jinnah Avenue
Islamabad, Pakistan
Phone: +92-51-227-XXXX
Email: [email protected]
NTN: 1234567-8
License No: IESCO-ELC-2024-0891
Client Details
Mr. Ahmed Raza Khan
House 112, Street 9, F-10/2
Islamabad, Pakistan
Phone: +92-300-XXXXXXX
Email: [email protected]
Property Type: Residential Villa (3 Floors)
| Quotation No.: | QTE-2025-0472 |
| Date of Issue: | 15 June 2025 |
| Valid Until: | 15 July 2025 (30 Days) |
| Project Location: | F-10/2, Islamabad, Pakistan |
| Estimated Duration: | 12 Working Days |
This Quotation Estimate is prepared by Capital Electric Solutions (Pvt.) Ltd., a licensed and certified Electrician firm operating in Pakistan Islamabad, for the comprehensive electrical installation, renovation, and maintenance of the client's residential property. All work shall be carried out in strict compliance with the Pakistan Electrical and Electronic Engineering Council (PEECC) standards, IESCO (Islamabad Electric Supply Company) regulations, and the National Building Code of Pakistan. Our team of qualified Electrician professionals will ensure that every aspect of the electrical work meets the highest safety and quality benchmarks required for residential properties in Pakistan Islamabad.
| # | Description of Electrician Work | Quantity | Unit Rate (PKR) | Total Amount (PKR) |
|---|---|---|---|---|
| 1 | Complete rewiring of 3-floor residential villa (copper wiring, 2.5 sq mm and 4 sq mm) including all conduits, junction boxes, and distribution boards | 1 Lot | 485,000 | 485,000 |
| 2 | Installation of 48 ceiling light fixtures, 24 wall switches, and 36 socket outlets (Schneider Electric / Legrand brand) | 1 Lot | 198,000 | 198,000 |
| 3 | Supply and installation of 3-phase main distribution board with 24-way MCBs, RCD protection, and surge arrestor (IEC 60898 compliant) | 1 Unit | 87,500 | 87,500 |
| 4 | Installation of 6 inverter/UPS backup systems (5 kVA each) with 12V 200Ah battery banks for critical loads | 6 Units | 62,000 | 372,000 |
| 5 | Earthing and grounding system installation (copper rod, 25 sq mm earth wire, earth resistance < 5 ohms) as per Pakistan Islamabad utility requirements | 1 Lot | 54,000 | 54,000 |
| 6 | Installation of 4 CCTV security cameras (4MP, night vision) with 2TB NVR, cabling, and configuration | 1 Lot | 145,000 | 145,000 |
| 7 | Smart home automation: Wi-Fi controlled lighting, AC remote management, and door access system (3 floors) | 1 Lot | 210,000 | 210,000 |
| 8 | Electrical safety inspection, thermal imaging scan, load balancing, and final IESCO compliance certification for Pakistan Islamabad | 1 Lot | 32,000 | 32,000 |
| 9 | Labour charges for all Electrician technicians (6 technicians, 12 days) including site supervision and project management | 1 Lot | 168,000 | 168,000 |
| 10 | Waste disposal, site cleanup, and final handover documentation including as-built electrical drawings | 1 Lot | 18,500 | 18,500 |
| Subtotal | PKR 1,770,000 |
| GST (18% as per Pakistan Federal Tax Rules) | PKR 318,600 |
| Site Access & Logistics (Islamabad) | PKR 12,000 |
| Grand Total | PKR 2,100,600 |
- This Quotation Estimate is valid for thirty (30) calendar days from the date of issue. After the expiry date, pricing may be revised due to fluctuating material costs in the Pakistan Islamabad market.
- Payment Terms: 40% advance payment upon acceptance of this Quotation Estimate, 40% upon completion of 70% of the Electrician work, and 20% upon final inspection and handover.
- All materials and components shall be of genuine, ISI-marked or internationally certified brands. The Electrician team shall provide original purchase invoices for all major equipment.
- The total project duration is estimated at twelve (12) working days, subject to weather conditions and client availability for access to the property in Pakistan Islamabad.
- A comprehensive two-year warranty is provided on all labour work. Manufacturer warranties apply to all supplied equipment and components.
- All electrical work shall be performed by licensed Electrician professionals registered with the Pakistan Electrical and Electronic Engineering Council (PEECC). No unlicensed personnel shall be deployed on site.
- The client shall ensure that all necessary NOCs from the housing authority (IHS - Islamabad Housing Society) and IESCO are obtained prior to commencement of work.
- Any additional work beyond the scope described in this Quotation Estimate shall be subject to a separate written amendment and additional cost approval by the client.
- In the event of force majeure (natural disasters, government-imposed restrictions, or utility outages exceeding 48 hours in Pakistan Islamabad), the project timeline shall be extended accordingly without penalty to either party.
- All disputes arising from this Quotation Estimate shall be resolved through arbitration in Islamabad, Pakistan, in accordance with the Arbitration Act of Pakistan.
Authorized Signatory / Chief Electrician
Name: Eng. Muhammad Tariq
Date: _______________ Client Acceptance
Name: Mr. Ahmed Raza Khan
Signature: _______________
Date: _______________ ⬇️ Download as DOCX Edit online as DOCX
Create your own Word template with our GoGPT AI prompt:
GoGPT