GoGPT GoSearch New DOC New XLS New PPT

OffiDocs favicon

Quotation Estimate Environmental Engineer in Afghanistan Kabul –Free Word Template Download with AI

GreenSolutions Environmental Consulting (Pvt.) Ltd.

Office: Wazir Akbar Khan Road, Kabul, Afghanistan | Tel: +93 700 123 456 | Email: [email protected]

Registration No: AF-ENV-2024-0087 | Tax ID: 10458723

Quotation Estimate No. QEST-2025-KBL-0142 Date of Issue 15 June 2025
Validity Period 60 Calendar Days from Date of Issue Currency US Dollars (USD)
Client / Recipient Ministry of Energy and Water, Republic of Afghanistan Project Location Afghanistan Kabul – District 4, Industrial Zone
Prepared By Eng. Farid Ahmadzai, Senior Environmental Engineer Reference RFP No. MEW/ENV/2025/0312
1. Scope of Work – Environmental Engineer Services in Afghanistan Kabul

This Quotation Estimate is submitted by GreenSolutions Environmental Consulting (Pvt.) Ltd. in response to the Request for Proposal issued by the Ministry of Energy and Water, Republic of Afghanistan. The scope of work encompasses the provision of a qualified Environmental Engineer to deliver comprehensive environmental impact assessment, monitoring, and compliance services for the proposed wastewater treatment infrastructure project located in Afghanistan Kabul. The Environmental Engineer shall be responsible for conducting baseline environmental surveys, preparing the Environmental Impact Assessment (EIA) report in accordance with the National Environmental Protection Agency (NEPA) regulations of Afghanistan, designing mitigation measures, and overseeing construction-phase environmental monitoring throughout the project lifecycle in the Afghanistan Kabul metropolitan area.

The engagement of the Environmental Engineer shall cover a minimum duration of eighteen (18) months, commencing upon contract award. All fieldwork, laboratory sampling, and reporting activities shall be conducted within the administrative boundaries of Afghanistan Kabul, with particular focus on the Kabul River basin, the industrial corridor along Wazir Akbar Khan Road, and the residential zones in Districts 4, 5, and 6. The Environmental Engineer shall coordinate directly with the NEPA Kabul Regional Office, the Ministry of Public Health, and the Kabul City Municipality to ensure full regulatory compliance.

2. Detailed Cost Breakdown
Ref Description of Service / Item Qty Unit Unit Rate (USD) Amount (USD)
2.1 Senior Environmental Engineer – Monthly Professional Fee (includes site supervision, EIA preparation, NEPA liaison, and monthly progress reporting for the Afghanistan Kabul project site) 18 Month 4,500.00 81,000.00
2.2 Junior Environmental Engineer / Assistant – Monthly Professional Fee (supports baseline data collection, water and soil sampling in Afghanistan Kabul, and GIS mapping) 18 Month 2,200.00 39,600.00
2.3 Environmental Impact Assessment (EIA) Report Preparation – Full scope including Scoping, Baseline Study, Impact Prediction, Mitigation Plan, and Public Consultation documentation for the Afghanistan Kabul wastewater project 1 Lump Sum 18,500.00 18,500.00
2.4 Water Quality Monitoring – Quarterly sampling and laboratory analysis (24 parameters) at 12 monitoring stations along the Kabul River within Afghanistan Kabul 6 Quarter 3,200.00 19,200.00
2.5 Air Quality and Noise Monitoring – Continuous monitoring during construction phase at the Afghanistan Kabul project site (PM2.5, PM10, SO2, NO2, CO, and dB levels) 12 Month 1,800.00 21,600.00
2.6 Soil and Groundwater Contamination Assessment – Pre-construction baseline survey at 8 borehole locations in the Afghanistan Kabul industrial zone 1 Lump Sum 7,400.00 7,400.00
2.7 Environmental Management Plan (EMP) Development and Construction Phase Environmental Monitoring (CEMP) – Ongoing supervision by the Environmental Engineer throughout construction in Afghanistan Kabul 18 Month 1,500.00 27,000.00
2.8 Public Consultation and Stakeholder Engagement – Minimum 4 community meetings in Afghanistan Kabul neighborhoods, including translation services (Dari/Pashto) and documentation 4 Session 1,200.00 4,800.00
2.9 Transportation, Local Logistics, and Field Equipment – 4x4 vehicle rental, fuel, PPE, portable monitoring instruments, and field supplies for operations in Afghanistan Kabul 18 Month 950.00 17,100.00
2.10 Permits, NEPA Registration Fees, and Government Liaison Costs – All required environmental permits and regulatory filings for the Afghanistan Kabul project 1 Lump Sum 3,500.00 3,500.00
2.11 Final Environmental Compliance Report and Project Closure Documentation – Submission to NEPA and Ministry of Energy and Water upon completion in Afghanistan Kabul 1 Lump Sum 5,000.00 5,000.00
Subtotal (USD) 244,700.00
Applicable Taxes and Levies (as per Afghanistan tax regulations) 0.00
TOTAL QUOTATION ESTIMATE AMOUNT (USD) 244,700.00
3. Payment Schedule

Payment for this Quotation Estimate shall be made in the following installments, subject to satisfactory delivery of milestones as verified by the Client's project management team in Afghanistan Kabul:

  • Advance Payment (20%): USD 48,940.00 – Upon contract signing and submission of the Environmental Engineer's mobilization plan.
  • Progress Payment 1 (25%): USD 61,175.00 – Upon approval of the EIA Scoping Report and Baseline Study by NEPA Kabul.
  • Progress Payment 2 (25%): USD 61,175.00 – Upon submission of the full EIA Report and EMP for the Afghanistan Kabul project.
  • Progress Payment 3 (20%): USD 48,940.00 – Upon completion of construction-phase monitoring (Month 12).
  • Final Payment (10%): USD 24,470.00 – Upon acceptance of the Final Environmental Compliance Report and project closure in Afghanistan Kabul.
4. Terms and Conditions
  • This Quotation Estimate is valid for sixty (60) calendar days from the date of issue. Beyond this period, prices may be revised due to currency fluctuation or changes in local operating costs in Afghanistan Kabul.
  • The Environmental Engineer and all supporting staff shall comply with all applicable laws and regulations of the Islamic Republic of Afghanistan, including the Environmental Protection Law (2009) and NEPA directives.
  • All work shall be performed at the designated project site in Afghanistan Kabul. Any relocation or additional site visits outside the Kabul metropolitan area shall be subject to a separate cost amendment.
  • The Client reserves the right to request reasonable modifications to the scope. Any such changes shall be documented in a written Change Order and priced separately.
  • Intellectual property rights for all reports, data, and documentation produced under this Quotation Estimate shall vest in the Client upon full payment.
  • Disputes arising from this engagement shall be resolved through amicable negotiation, failing which they shall be referred to arbitration under the rules of the Kabul Chamber of Commerce.
  • Force majeure events, including but not limited to security incidents, natural disasters, or government-imposed restrictions in Afghanistan Kabul, shall extend the project timeline proportionally without penalty to either party.
  • The Environmental Engineer shall maintain professional liability insurance with a minimum coverage of USD 500,000 for the duration of the contract.
5. Acceptance and Authorization

By signing below, the Client acknowledges receipt of this Quotation Estimate and agrees to the terms, conditions, and pricing outlined herein for the engagement of the Environmental Engineer and associated services in Afghanistan Kabul.

For GreenSolutions Environmental Consulting (Pvt.) Ltd.
Name: Eng. Farid Ahmadzai
Title: Senior Environmental Engineer / Managing Director
Date: _______________
For the Client – Ministry of Energy and Water, Afghanistan
Name: ___________________________
Title: ___________________________
Date: _______________

This Quotation Estimate document (Ref: QEST-2025-KBL-0142) is issued by GreenSolutions Environmental Consulting (Pvt.) Ltd. for Environmental Engineer services in Afghanistan Kabul. This document is confidential and intended solely for the named recipient. Unauthorized reproduction or distribution is prohibited.

Page 1 of 1 | Generated: 15 June 2025

⬇️ Download as DOCX Edit online as DOCX

Create your own Word template with our GoGPT AI prompt:

GoGPT
×
Advertisement
❤️Shop, book, or buy here — no cost, helps keep services free.