GoGPT GoSearch New DOC New XLS New PPT

OffiDocs favicon

Quotation Estimate Environmental Engineer in Nepal Kathmandu –Free Word Template Download with AI

Plot No. 42, New Baneshwor, Kathmandu, Nepal

Tel: +977-1-4768230 | Email: [email protected]

Reg. No.: 2021/04567 | VAT Reg. No.: 801234567

Quotation Estimate

Quotation Details

Quotation No.: GSEC/QE/2025/0087

Date of Issue: 15 June 2025

Validity Period: 30 days from date of issue

Project Location: Nepal Kathmandu Valley

Client Information

Client Name: Kathmandu Metropolitan Development Authority

Address: Durbar Marg, Kathmandu, Nepal

Attention: Mr. Rajesh Shrestha, Project Director

Contact: +977-1-4255678

Dear Sir/Madam,

Thank you for considering GreenScape Environmental Consulting Pvt. Ltd. for your environmental compliance and assessment requirements. We are pleased to submit this Quotation Estimate for the professional services of a qualified Environmental Engineer to be deployed and utilized within the Nepal Kathmandu metropolitan area. This Quotation Estimate has been prepared in accordance with the standards set forth by the Department of Environment (DoE), Government of Nepal, and complies with all applicable regulations under the Environment Protection Act, 2076 (2019) and the Environment Protection Rules, 2077 (2020).

Scope of Work – Environmental Engineer Services in Nepal Kathmandu

The following Quotation Estimate covers the comprehensive engagement of a senior Environmental Engineer to perform environmental impact assessments, pollution monitoring, and regulatory compliance audits for industrial and commercial facilities located in and around Nepal Kathmandu. The Environmental Engineer will be responsible for conducting site inspections, preparing Environmental Impact Assessment (EIA) reports, managing waste treatment systems, and ensuring full compliance with the DoE's Environmental Clearance Certificate (ECC) requirements specific to the Nepal Kathmandu jurisdiction.

Itemized Quotation Estimate Breakdown
S.No. Description of Service Quantity Unit Unit Rate (NPR) Amount (NPR)
1 Engagement of Senior Environmental Engineer (15+ years experience) for full-time project supervision in Nepal Kathmandu 1 Month 185,000 185,000
2 Environmental Impact Assessment (EIA) report preparation for industrial facility – Kathmandu Valley 1 Report 450,000 450,000
3 Air quality monitoring and baseline survey (PM2.5, PM10, SO2, NOx, CO) – 4 monitoring stations in Nepal Kathmandu 4 Station 95,000 380,000
4 Water quality testing and analysis (Bagmati River tributaries and industrial effluent) – 24 parameters 12 Sample 18,500 222,000
5 Soil contamination assessment and heavy metal analysis for 3 designated sites in Nepal Kathmandu 3 Site 125,000 375,000
6 Waste management plan development and solid waste audit for commercial complex 1 Plan 275,000 275,000
7 Environmental Compliance Audit and ECC renewal documentation support 1 Audit 195,000 195,000
8 Community consultation and public hearing facilitation (minimum 2 sessions in Nepal Kathmandu) 2 Session 85,000 170,000
9 Transportation, field equipment, and laboratory consumables for Environmental Engineer fieldwork in Nepal Kathmandu 1 Lump Sum 145,000 145,000
10 Project management, reporting, and final documentation submission to DoE Nepal Kathmandu office 1 Lump Sum 110,000 110,000
Subtotal (NPR) 2,507,000
VAT @ 13% 325,910
TOTAL AMOUNT (NPR) 2,832,910

Total in Words: Two Million Eight Hundred Thirty-Two Thousand Nine Hundred and Ten Nepalese Rupees Only.

Terms and Conditions of This Quotation Estimate
  1. This Quotation Estimate is valid for a period of thirty (30) calendar days from the date of issue. Beyond this period, rates may be subject to revision based on market conditions in Nepal Kathmandu.
  2. The Environmental Engineer assigned to this project shall hold a valid license issued by the Nepal Engineering Council and a minimum of fifteen (15) years of professional experience in environmental consulting within the Nepal Kathmandu region.
  3. Payment terms: 30% advance upon acceptance of this Quotation Estimate, 40% upon completion of fieldwork and data collection, and 30% upon final report submission and DoE approval in Nepal Kathmandu.
  4. All work shall be conducted in strict compliance with the Environment Protection Act, 2076, the Environment Protection Rules, 2077, and the Kathmandu Valley Development Authority (KVDA) bylaws applicable to Nepal Kathmandu.
  5. The Environmental Engineer shall submit weekly progress reports to the client and a comprehensive final report in both Nepali and English languages.
  6. Any additional scope beyond what is described in this Quotation Estimate shall be subject to a separate written amendment and additional cost approval.
  7. This Quotation Estimate does not include government fees, permit charges, or third-party laboratory accreditation costs, which shall be borne by the client.
  8. Disputes arising from this engagement shall be resolved through arbitration in accordance with the Arbitration Act, 2055 (1999) of Nepal, with the seat of arbitration in Nepal Kathmandu.
  9. The Environmental Engineer shall maintain professional indemnity insurance of not less than NPR 5,000,000 for the duration of the project.
  10. All data and reports generated under this Quotation Estimate shall remain the intellectual property of the client upon full payment.
Acceptance and Authorization

By signing below, the client acknowledges and accepts this Quotation Estimate for the services of the Environmental Engineer as described herein, to be executed in Nepal Kathmandu under the terms and conditions stated above.

For and on behalf of GreenScape Environmental Consulting Pvt. Ltd.
Name: Dr. Anil Gurung, P.E.
Designation: Chief Environmental Engineer
Date: _______________
For and on behalf of the Client
Name: _________________________
Designation: Project Director
Date: _______________

GreenScape Environmental Consulting Pvt. Ltd. | New Baneshwor, Kathmandu, Nepal | This Quotation Estimate is a controlled document. Unauthorized reproduction is prohibited.

Page 1 of 1 | Document Ref: GSEC/QE/2025/0087

⬇️ Download as DOCX Edit online as DOCX

Create your own Word template with our GoGPT AI prompt:

GoGPT
×
Advertisement
❤️Shop, book, or buy here — no cost, helps keep services free.