GoGPT GoSearch New DOC New XLS New PPT

OffiDocs favicon

Quotation Estimate Environmental Engineer in United Arab Emirates Abu Dhabi –Free Word Template Download with AI

Professional Environmental Engineering Services

United Arab Emirates — Abu Dhabi

Quotation No.: QTE-AD-2025-04782
Date of Issue: 15 June 2025
Valid Until: 15 July 2025
Prepared By: Gulf Environmental Engineering Consultants LLC
Address: Office 12, Al Reem Island, Abu Dhabi, United Arab Emirates
Contact: +971 2 445 6789 | [email protected]
1. Client Information
Client Name: Al Noor Development Group FZE Project Reference: ADN-2025-ENV-034
Project Location: Khalifa Industrial Zone 3 (KIZAD), Abu Dhabi, United Arab Emirates Client Contact: Mr. Khalid Al Mansoori — +971 50 123 4567
2. Scope of Work — Environmental Engineer Services

This Quotation Estimate is issued by Gulf Environmental Engineering Consultants LLC to provide comprehensive professional services rendered by a licensed Environmental Engineer for the Al Noor Development Group FZE industrial expansion project located in Abu Dhabi, United Arab Emirates. The scope of work encompasses all environmental compliance, impact assessment, monitoring, and regulatory liaison activities required under the Abu Dhabi Environment Agency (ADEA) and the Department of Energy (DoE) regulations in force within the United Arab Emirates.

The designated Environmental Engineer shall hold a valid professional license issued by the Abu Dhabi Department of Municipalities and Transport (DMT) and shall possess a minimum of ten (10) years of documented experience in industrial environmental management within the United Arab Emirates. All deliverables shall conform to the Abu Dhabi Environmental Standards (AES) and the Federal Environmental Law No. 47 of 2007 of the United Arab Emirates.

3. Itemized Cost Breakdown
# Description of Service Duration / Qty Unit Rate (AED) Amount (AED)
1 Preparation and submission of the Environmental Impact Assessment (EIA) report for the industrial expansion, including baseline environmental surveys (air, water, soil, noise, and ecological) conducted in accordance with ADEA guidelines in Abu Dhabi, United Arab Emirates. 1 Lot 185,000.00 185,000.00
2 Design and development of the Environmental Management Plan (EMP) and Environmental Monitoring Plan (EMoP) by the lead Environmental Engineer, covering construction and operational phases. 1 Lot 95,000.00 95,000.00
3 Quarterly environmental monitoring and compliance reporting (air quality, effluent discharge, noise levels, and waste management audits) at the KIZAD site, Abu Dhabi, United Arab Emirates. Includes laboratory analysis at ADEA-accredited facilities. 4 Quarters 42,500.00 170,000.00
4 Regulatory liaison and permit management: preparation, submission, and follow-up of all environmental permits, discharge licenses, and compliance certificates with ADEA, DoE, and Abu Dhabi Municipality on behalf of the client. 12 Months 68,000.00 68,000.00
5 Waste management strategy and hazardous waste characterization report, including coordination with licensed waste disposal contractors registered in the United Arab Emirates. 1 Lot 55,000.00 55,000.00
6 Environmental training and awareness workshops for client site personnel (minimum 3 sessions) conducted by the Environmental Engineer and support team at the Abu Dhabi project site. 3 Sessions 12,000.00 36,000.00
7 Emergency Environmental Response Plan (EERP) development and tabletop exercise facilitation in compliance with Abu Dhabi Civil Defence and ADEA emergency protocols. 1 Lot 48,000.00 48,000.00
8 Final Environmental Compliance Certificate preparation and handover documentation upon project completion, including all monitoring data, reports, and regulatory correspondence. 1 Lot 32,000.00 32,000.00
Subtotal (AED) 689,000.00
VAT @ 5% (United Arab Emirates) 34,450.00
TOTAL AMOUNT DUE (AED) 723,450.00
Note: All prices in this Quotation Estimate are quoted in United Arab Emirates Dirhams (AED) and are inclusive of all professional fees, travel within Abu Dhabi, and standard reporting. Any work outside the defined scope, additional site visits beyond Abu Dhabi emirate, or expedited regulatory processing shall be subject to a separate supplementary Quotation Estimate. 4. Payment Terms
Milestone Percentage Amount (AED) Due Date
Upon acceptance of this Quotation Estimate and contract execution 30% 217,035.00 Within 14 days of PO
Upon submission and ADEA approval of the EIA report 30% 217,035.00 Within 30 days of approval
Upon completion of all monitoring quarters and training sessions 25% 180,862.50 Within 30 days of completion
Upon final handover and Environmental Compliance Certificate 15% 108,517.50 Within 30 days of handover
5. Terms and Conditions
  1. This Quotation Estimate is valid for thirty (30) calendar days from the date of issue. Beyond this period, pricing may be revised to reflect current market conditions in the United Arab Emirates.
  2. The Environmental Engineer and all supporting personnel shall be fully insured under professional indemnity and public liability policies compliant with Abu Dhabi, United Arab Emirates, regulatory requirements.
  3. All intellectual property, reports, and data generated under this engagement shall become the sole property of the client upon full payment of all invoices.
  4. The Environmental Engineer shall maintain strict confidentiality of all client information, site data, and proprietary processes in accordance with UAE Federal Decree-Law No. 45 of 2021 on the Protection of Personal Data.
  5. Any change in scope, project duration, or site conditions shall be documented in a written Change Order signed by both parties before additional work commences.
  6. Disputes arising from this Quotation Estimate shall be resolved through arbitration in Abu Dhabi, United Arab Emirates, in accordance with the rules of the Abu Dhabi Commercial Conciliation and Arbitration Centre (ADCCAC).
  7. Force majeure events, including but not limited to government directives, natural disasters, or public health emergencies declared in the United Arab Emirates, shall extend project timelines proportionally without penalty to either party.
  8. The client shall provide reasonable access to the project site in Abu Dhabi, all existing environmental data, and necessary permits for the Environmental Engineer to perform the scoped activities.
  9. Failure to make payment within the stipulated due dates shall attract a late payment interest of 1.5% per month, calculated on the outstanding balance, in accordance with UAE commercial law.
6. Acceptance and Authorization

By signing below, the client acknowledges and accepts this Quotation Estimate for Environmental Engineer services in Abu Dhabi, United Arab Emirates, and agrees to all terms, conditions, and pricing outlined herein. This document, once countersigned, shall constitute a binding agreement between the parties.

For: Gulf Environmental Engineering Consultants LLC

Name: Eng. Sarah Al Rashidi
Title: Lead Environmental Engineer / Project Director
Date: _______________

For: Al Noor Development Group FZE

Name: Mr. Khalid Al Mansoori
Title: Project Director
Date: _______________

Gulf Environmental Engineering Consultants LLC — Registered in Abu Dhabi, United Arab Emirates — Trade License No. AD-2019-88432
This Quotation Estimate is the property of Gulf Environmental Engineering Consultants LLC and is issued solely for the client named herein. Unauthorized reproduction or distribution is prohibited.
© 2025 Gulf Environmental Engineering Consultants LLC. All Rights Reserved.

⬇️ Download as DOCX Edit online as DOCX

Create your own Word template with our GoGPT AI prompt:

GoGPT
×
Advertisement
❤️Shop, book, or buy here — no cost, helps keep services free.