Quotation Estimate Environmental Engineer in Vietnam Ho Chi Minh City –Free Word Template Download with AI
Professional Environmental Engineering Services
Prepared for Projects in Vietnam Ho Chi Minh City
Client Name: Saigon Industrial Development Joint Stock Company
Project Location: Binh Tan District, Vietnam Ho Chi Minh City
Project Description: Comprehensive environmental impact assessment, wastewater treatment system design, and ongoing environmental compliance monitoring for a new manufacturing facility in Vietnam Ho Chi Minh City.
This Quotation Estimate outlines the full scope of professional services to be delivered by a licensed Environmental Engineer and supporting technical team for the client's manufacturing project in Vietnam Ho Chi Minh City. The Environmental Engineer will be responsible for all phases of environmental planning, regulatory compliance, system design, and post-construction monitoring in accordance with Vietnamese national environmental standards (QCVN) and the Law on Environmental Protection 2020 (Law No. 72/2020/QH14).
The Environmental Engineer will conduct site assessments, prepare Environmental Impact Assessment (EIA) reports, design wastewater and air emission treatment systems, develop environmental management plans, and provide ongoing technical supervision throughout the project lifecycle in Vietnam Ho Chi Minh City.
| Item No. | Description of Service | Duration | Unit | Unit Price (VND) | Total (VND) |
|---|---|---|---|---|---|
| 01 | Initial site survey and environmental baseline assessment by Environmental Engineer in Vietnam Ho Chi Minh City | 10 days | Lump Sum | 45,000,000 | 45,000,000 |
| 02 | Preparation and submission of Environmental Impact Assessment (EIA) report to local authorities in Vietnam Ho Chi Minh City | 45 days | Lump Sum | 185,000,000 | 185,000,000 |
| 03 | Design of wastewater treatment system (capacity: 500 m³/day) by senior Environmental Engineer | 30 days | Lump Sum | 120,000,000 | 120,000,000 |
| 04 | Design of air emission control and noise mitigation systems | 20 days | Lump Sum | 75,000,000 | 75,000,000 |
| 05 | Environmental management plan development and emergency response protocol | 15 days | Lump Sum | 55,000,000 | 55,000,000 |
| 06 | Construction-phase environmental supervision by Environmental Engineer (monthly visits) | 6 months | Month | 28,000,000 | 168,000,000 |
| 07 | Post-commissioning environmental monitoring and quarterly compliance reporting in Vietnam Ho Chi Minh City | 12 months | Quarter | 35,000,000 | 140,000,000 |
| 08 | Regulatory liaison and permit acquisition support with Vietnam Ho Chi Minh City Department of Natural Resources and Environment | Ongoing | Lump Sum | 60,000,000 | 60,000,000 |
| SUBTOTAL (VND) | 848,000,000 | ||||
| VAT (10%) | 84,800,000 | ||||
| GRAND TOTAL (VND) | 932,800,000 | ||||
Grand Total in words: Nine Hundred Thirty-Two Million Eight Hundred Thousand Vietnamese Dong only.
- This Quotation Estimate is valid for a period of sixty (60) calendar days from the date of issue. After this period, pricing may be subject to revision based on market conditions in Vietnam Ho Chi Minh City.
- Payment terms: 30% advance payment upon contract signing, 40% upon completion of design and EIA submission, and 30% upon final project acceptance and handover of all documentation.
- All services will be performed by a qualified Environmental Engineer holding a valid professional license issued by the Ministry of Natural Resources and Environment of Vietnam, with a minimum of ten (10) years of experience in industrial environmental projects in Vietnam Ho Chi Minh City.
- The Environmental Engineer shall comply with all applicable Vietnamese environmental regulations, including Decree 08/2022/NĐ-CP and relevant QCVN standards specific to the Binh Tan District industrial zone.
- Any changes to the scope of work must be agreed upon in writing by both parties. Additional services will be billed separately at the rates specified in this Quotation Estimate.
- The client is responsible for providing timely access to the project site in Vietnam Ho Chi Minh City and all necessary operational data required by the Environmental Engineer.
- Confidentiality: All project data, design documents, and environmental reports prepared by the Environmental Engineer shall remain the exclusive property of the client and shall not be disclosed to third parties without written consent.
- Disputes arising from this Quotation Estimate and subsequent contract shall be resolved through arbitration in Vietnam Ho Chi Minh City in accordance with the rules of the Vietnam International Arbitration Centre (VIAC).
By signing below, the client acknowledges receipt of this Quotation Estimate and agrees to the terms, conditions, and pricing outlined herein for the engagement of the Environmental Engineer for the described project in Vietnam Ho Chi Minh City.
For GreenSolutions Environmental Consulting Co., Ltd.
Dr. Nguyen Van MinhLead Environmental Engineer
License No: ENV-2019-0847
Date: _______________
For Saigon Industrial Development JSC
Authorized RepresentativeName: _______________
Position: _______________
Date: _______________ ⬇️ Download as DOCX Edit online as DOCX
Create your own Word template with our GoGPT AI prompt:
GoGPT