GoGPT GoSearch New DOC New XLS New PPT

OffiDocs favicon

Quotation Estimate Industrial Engineer in Indonesia Jakarta –Free Word Template Download with AI

Jl. Jend. Sudirman Kav. 52-53, SCBD, Jakarta Selatan 12190, Indonesia Jakarta

Tel: +62-21-5790-1234 | Email: [email protected]

NPWP: 01.234.567.8-012.000 | Business License (NIB): 1203456789012

Quotation Estimate

Quotation No.: QTE/IE/JKT/2025/0047

Date of Issue: 15 June 2025

Valid Until: 15 July 2025 (30 days)

Currency: Indonesian Rupiah (IDR)

Prepared For: PT Maju Industri Manufaktur

Address: Kawasan Industri Jababeka, Cikarang, Bekasi, Indonesia Jakarta Metropolitan Area

Attn: Mr. Budi Santoso, Head of Operations

Contact: +62-21-8990-5567

This Quotation Estimate is issued by PT Nusantara Engineering Solutions to provide a comprehensive cost breakdown for the engagement of a qualified Industrial Engineer to deliver process optimization, workflow analysis, and operational improvement services at the client's manufacturing facility located in the Indonesia Jakarta metropolitan region. This document serves as a formal estimate of all professional fees, travel expenses, and ancillary costs associated with the proposed scope of work.

1. Scope of Work – Industrial Engineer Services

The Industrial Engineer engaged under this Quotation Estimate shall perform the following duties and deliverables at the client's production site in Indonesia Jakarta:

  • Conduct a full-time study of existing production lines, assembly processes, and material flow systems to identify bottlenecks, redundancies, and areas of inefficiency.
  • Develop and implement time-and-motion studies, work measurement analyses, and standard time calculations for all critical operations.
  • Design and propose an optimized plant layout and workstation arrangement to minimize material handling distances and reduce cycle times by a target of 15–25%.
  • Prepare a comprehensive Industrial Engineering report including process flow diagrams, value-stream mapping, capacity planning models, and a detailed implementation roadmap.
  • Provide on-site supervision and training for a period of four (4) weeks to ensure the client's internal team can sustain the improvements independently.
  • Deliver a final presentation and handover session to the client's management team in Indonesia Jakarta.
2. Itemized Cost Breakdown
No. Description of Service / Item Quantity Unit Unit Price (IDR) Subtotal (IDR)
1 Industrial Engineer – Senior Consultant (process analysis, time study, layout design) 20 Man-days 8,500,000 170,000,000
2 Industrial Engineer – Junior Analyst (data collection, documentation support) 15 Man-days 4,200,000 63,000,000
3 Specialized software licensing (AutoCAD Plant 3D, Arena Simulation, Minitab) – project duration 1 Package 12,000,000 12,000,000
4 On-site travel and local transportation within Indonesia Jakarta and surrounding industrial zones 30 Days 750,000 22,500,000
5 Accommodation and per diem for the Industrial Engineer team (4-week on-site deployment) 28 Nights 1,800,000 50,400,000
6 Final Industrial Engineering report, process documentation, and training materials (hard copy and digital) 1 Set 8,000,000 8,000,000
7 Management presentation and handover session in Indonesia Jakarta 1 Session 5,000,000 5,000,000
8 Project management and coordination overhead (10% of items 1–7) 1 Lot — 33,090,000
Subtotal 363,990,000
VAT (PPN) 11% 40,038,900
GRAND TOTAL 404,028,900

Total Amount in Words: Four Hundred Four Million Twenty-Eight Thousand Nine Hundred Rupiah Only (IDR 404,028,900).

3. Project Timeline
Phase Activity Duration Location
Phase 1Site survey, data collection, and preliminary process mappingWeek 1Indonesia Jakarta (client facility)
Phase 2Detailed time study, bottleneck analysis, and simulation modelingWeek 2–3Indonesia Jakarta (client facility)
Phase 3Layout redesign, implementation planning, and pilot testingWeek 3–4Indonesia Jakarta (client facility)
Phase 4Training, final reporting, and management handoverWeek 4Indonesia Jakarta (client office)
4. Payment Terms
  • 30% advance payment upon acceptance of this Quotation Estimate and signing of the Service Agreement: IDR 121,208,670.
  • 40% upon completion of Phase 2 (detailed analysis and simulation deliverables): IDR 161,611,560.
  • 30% upon final handover and acceptance of the Industrial Engineering report: IDR 121,208,670.
  • All payments shall be made via bank transfer to: Bank Mandiri, Account No. 137-00-0123456-7, a.n. PT Nusantara Engineering Solutions.
  • Invoices are payable within fourteen (14) calendar days from the date of invoice issuance.
5. Terms and Conditions
  1. This Quotation Estimate is valid for thirty (30) calendar days from the date of issue. Any request for a revised estimate after the validity period shall be subject to re-evaluation of rates.
  2. The Industrial Engineer and supporting team shall comply with all applicable Indonesian labor regulations, occupational health and safety standards (K3), and site-specific safety protocols at the client's facility in Indonesia Jakarta.
  3. The client shall provide the Industrial Engineer team with safe access to all relevant production areas, existing documentation, and necessary personnel for interviews and observations.
  4. All intellectual property, reports, and deliverables produced under this engagement shall become the sole property of the client upon full and final payment.
  5. Any scope changes or additional work requested by the client beyond the original scope defined in Section 1 shall be subject to a supplementary Quotation Estimate and written approval before execution.
  6. This Quotation Estimate does not constitute a binding contract. A formal Service Agreement must be executed by both parties prior to the commencement of work.
  7. Disputes arising from this engagement shall be resolved through amicable negotiation. In the event of unresolved disputes, the parties agree to submit the matter to the competent court in Indonesia Jakarta.
6. Acceptance

By signing below, the client acknowledges receipt of this Quotation Estimate for Industrial Engineer services in Indonesia Jakarta and agrees to the terms, conditions, and pricing outlined herein. This signature does not constitute a binding commitment until a formal Service Agreement is executed.

Prepared By (PT Nusantara Engineering Solutions)

Dr. Andi Wijaya, P.Eng.

Principal Industrial Engineer

Date: _______________

Accepted By (PT Maju Industri Manufaktur)

Mr. Budi Santoso

Head of Operations

Date: _______________

PT Nusantara Engineering Solutions | Jl. Jend. Sudirman Kav. 52-53, SCBD, Jakarta Selatan 12190, Indonesia Jakarta

This Quotation Estimate is the property of PT Nusantara Engineering Solutions. Unauthorized reproduction is prohibited.

Document Ref: QTE/IE/JKT/2025/0047 | Page 1 of 1

⬇️ Download as DOCX Edit online as DOCX

Create your own Word template with our GoGPT AI prompt:

GoGPT
×
Advertisement
❤️Shop, book, or buy here — no cost, helps keep services free.