Quotation Estimate Mason in China Shanghai –Free Word Template Download with AI

Professional Mason Services — China Shanghai
Quotation No.: QTE-SH-2025-0487 Date of Issue: June 15, 2025
Validity Period: 30 Calendar Days Currency: Chinese Yuan (CNY / RMB)
Prepared By: Shanghai Mason Construction Co., Ltd. Project Location: Pudong New Area, China Shanghai
Client Name: Shanghai Riverside Development Group Contact Person: Mr. Wei Zhang, Project Director

This Quotation Estimate is formally issued by Shanghai Mason Construction Co., Ltd. to provide a comprehensive and itemized cost breakdown for professional Mason services to be executed at the designated project site located in China Shanghai, specifically within the Pudong New Area district. The scope of work encompasses all masonry-related construction activities including but not limited to bricklaying, blockwork, stone setting, mortar application, and structural masonry repairs. This document serves as the definitive financial proposal and shall remain valid for the period stated above, after which all pricing may be subject to revision based on prevailing material costs and labor market conditions in the Shanghai metropolitan region.

Item No. Description of Mason Work Unit Quantity Unit Price (CNY) Total (CNY)
01 Structural bricklaying (red clay bricks, 240mm x 115mm x 53mm) for load-bearing walls m² 1,250 185.00 231,250.00
02 Concrete block masonry (200mm x 200mm x 400mm) for partition walls m² 860 142.00 122,120.00
03 Natural granite stone cladding and setting for exterior facade m² 420 680.00 285,600.00
04 Mortar mixing, application, and joint finishing (Type M and Type S mortar) m³ 38 950.00 36,100.00
05 Mason scaffolding erection, maintenance, and dismantling Week 12 18,500.00 222,000.00
06 Skilled Mason labor (certified, 8-hour shifts, 6 days/week) Man-day 3,400 420.00 1,428,000.00
07 Quality inspection, curing, and final masonry finishing Lot 1 45,000.00 45,000.00
08 Site management, safety compliance (China GB standards), and documentation Month 6 32,000.00 192,000.00
SUBTOTAL 2,562,070.00
VAT (13% — PRC Standard Rate) 333,069.10
GRAND TOTAL (CNY) 2,895,139.10

The total amount specified in this Quotation Estimate shall be disbursed according to the following milestone-based payment structure, aligned with the progress of Mason work completion at the China Shanghai project site:

  • Advance Payment (20%): CNY 579,027.82 — Due upon contract execution and site mobilization.
  • Progress Payment 1 (30%): CNY 868,541.73 — Due upon completion of all structural bricklaying and blockwork (Items 01 & 02).
  • Progress Payment 2 (30%): CNY 868,541.73 — Due upon completion of stone cladding and mortar finishing (Items 03 & 04).
  • Final Payment (20%): CNY 579,027.82 — Due upon final inspection, acceptance, and handover of all masonry works.
  • This Quotation Estimate is non-binding until formally accepted in writing by the client and countersigned by both parties.
  • All Mason work shall comply with the current Chinese National Standards (GB 50203-2011 for Masonry Structure Engineering) and local Shanghai municipal building regulations.
  • The project timeline is estimated at 24 weeks from the date of site access, subject to weather conditions and client-approved schedule changes in China Shanghai.
  • Any variation in scope exceeding 10% of the original Quotation Estimate value shall require a supplementary written agreement.
  • All materials shall be sourced from approved suppliers within the Shanghai metropolitan area to ensure quality consistency and timely delivery.
  • The Mason team shall hold valid PRC construction worker certifications and shall be covered under mandatory work-injury insurance as required by Chinese labor law.
  • Disputes arising from this quotation shall be resolved through arbitration at the Shanghai Arbitration Commission in accordance with its rules.
  • This Quotation Estimate does not include costs for architectural design, structural engineering calculations, or permits, which shall be the responsibility of the client.

By signing below, both parties acknowledge that this Quotation Estimate for Mason services in China Shanghai has been reviewed, understood, and agreed upon in all respects.

For: Shanghai Mason Construction Co., Ltd.

Name: _________________________

Title: General Manager

Signature: _________________________

Date: _________________________

For: Shanghai Riverside Development Group

Name: _________________________

Title: Project Director

Signature: _________________________

Date: _________________________

Shanghai Mason Construction Co., Ltd. | 888 Century Avenue, Pudong New Area, China Shanghai 200120

Tel: +86-21-5888-6600 | Email: [email protected] | Unified Social Credit Code: 91310115MA1K3XXXXX

This Quotation Estimate is valid for 30 days from the date of issue. Page 1 of 1.