Quotation Estimate Mason in Ghana Accra –Free Word Template Download with AI
Accra Mason & Build Ltd.
14 Independence Avenue, Osu
Accra, Ghana
Tel: +233 (0) 30 274 5512
Email: [email protected] Prepared For:
Mr. Kwame Asante
22 Aburi Road, East Legon
Accra, Ghana
Tel: +233 (0) 24 881 3367
Email: [email protected] 1. Quotation Estimate Summary
This Quotation Estimate is issued by Accra Mason & Build Ltd. in response to the request for comprehensive Mason and masonry services for a residential construction project located in Ghana Accra. This document outlines the full scope of work, material specifications, labour charges, and associated costs for the masonry phase of the client's two-storey dwelling at East Legon, Accra. The Quotation Estimate is valid for a period of thirty (30) calendar days from the date of issue, after which pricing may be subject to revision due to fluctuations in material costs within the Ghana Accra construction market.
2. Scope of Mason WorkThe Mason team assigned to this project will execute all masonry works as detailed below. Our senior Mason, with over fifteen years of experience in residential and commercial construction across Ghana Accra, will supervise all operations to ensure compliance with the Ghana Building and Planning Code and local structural standards.
- Construction of load-bearing walls (ground floor and first floor) using 9-inch and 6-inch concrete blocks, totaling approximately 4,200 blocks.
- Construction of internal partition walls using 4-inch hollow blocks, estimated at 1,800 blocks.
- Building of external perimeter walls with a height of 3.6 metres, incorporating proper foundation tie-in as per the approved architectural drawings.
- Installation of lintels, ring beams, and column reinforcement at all door and window openings.
- Application of cement mortar (1:4 mix ratio) for all blockwork and 1:3 mix for plastering surfaces.
- Construction of a rear service wall and boundary wall (12 linear metres) at the rear of the property.
- Preparation and finishing of all masonry surfaces ready for subsequent plastering and painting phases.
| No. | Description of Mason Work | Quantity | Unit Rate (GHS) | Amount (GHS) |
|---|---|---|---|---|
| 1 | 9-inch concrete blockwork (load-bearing walls, both floors) | 4,200 blocks | 85.00 | 357,000.00 |
| 2 | 4-inch hollow blockwork (internal partitions) | 1,800 blocks | 62.00 | 111,600.00 |
| 3 | Cement mortar supply and application (1:4 and 1:3 mixes) | 280 bags | 145.00 | 40,600.00 |
| 4 | Lintel and ring beam installation (RC) | 34 units | 1,250.00 | 42,500.00 |
| 5 | Boundary wall construction (rear, 12 lm) | 12 lm | 3,800.00 | 45,600.00 |
| 6 | Skilled Mason labour (senior Mason + 4 assistants, 14 weeks) | 14 weeks | 18,500.00 | 259,000.00 |
| 7 | Site supervision, quality control, and safety compliance | 14 weeks | 4,200.00 | 58,800.00 |
| 8 | Transportation of materials within Ghana Accra (Osu to East Legon) | Flat rate | 1.00 | 12,000.00 |
| SUBTOTAL | 927,100.00 | |||
| VAT (15% — Ghana Revenue Authority) | 139,065.00 | |||
| GRAND TOTAL (GHS) | 1,066,165.00 | |||
Payment for this Quotation Estimate shall be structured as follows: a mobilisation advance of 30% upon signing of the contract; 40% upon completion of ground-floor masonry; 20% upon completion of first-floor masonry; and the remaining 10% upon final handover and client sign-off. All payments shall be made in Ghana Cedis (GHS) via bank transfer to the account of Accra Mason & Build Ltd. at Ecobank, Accra Branch.
5. Terms and Conditions- This Quotation Estimate is valid for thirty (30) days from the date of issue. Beyond this period, the Mason team and material pricing may be subject to adjustment.
- All masonry work shall be carried out in strict accordance with the approved architectural and structural drawings for the Ghana Accra site.
- The client is responsible for obtaining all necessary building permits from the Accra Metropolitan Assembly and the Ghana Building and Planning Department prior to commencement.
- Weather-related delays (exceeding 48 consecutive hours of heavy rainfall) shall be excluded from the project timeline and communicated in writing by the supervising Mason.
- A twelve-month workmanship warranty is provided on all masonry works. This warranty covers structural defects in blockwork, mortar application, and lintel installation but does not cover damage caused by subsequent alterations, natural disasters, or third-party interference.
- The Mason crew shall adhere to all occupational health and safety regulations as stipulated by the Ghana Labour Act, 2003 (Act 651).
- Any variation or change order to the scope of work outlined in this Quotation Estimate must be agreed upon in writing by both parties before additional work commences.
The estimated duration for completion of all masonry works described in this Quotation Estimate is fourteen (14) working weeks from the date of site mobilisation. The Mason team will operate Monday through Saturday, 7:00 AM to 5:00 PM, in compliance with local working-hour regulations in Ghana Accra. A detailed weekly progress schedule will be provided to the client upon contract execution.
7. Acceptance and AuthorizationBy signing below, the client acknowledges receipt of this Quotation Estimate and agrees to the terms, conditions, and pricing outlined herein for the Mason services to be rendered at the specified location in Ghana Accra.
For Accra Mason & Build Ltd.______________________________
Name: Nana Yaw Ofori
Title: Lead Mason / Project Director
Date: _______________ For the Client
______________________________
Name: Kwame Asante
Title: Property Owner
Date: _______________ ⬇️ Download as DOCX Edit online as DOCX
Create your own Word template with our GoGPT AI prompt:
GoGPT