Quotation Estimate Mason in India New Delhi –Free Word Template Download with AI
Shri Ram Construction & Mason Services Pvt. Ltd.
Plot No. 47, Industrial Area, Okhla Phase II, New Delhi – 110020, India
Phone: +91-98110-XXXXX | Email: [email protected]
GSTIN: 07AABCS1234F1Z5 | CIN: U45200DL2015PTC289456
1. Client / Project Details| Client Name: | M/s. Gupta Residential Developers LLP |
| Project Address: | Block C, Sector 18, Rohini, New Delhi – 110085, India |
| Project Type: | Residential Building – Mason Work (Ground Floor to 4th Floor) |
| Estimated Duration: | 90 Working Days from Commencement |
This Quotation Estimate is issued by Shri Ram Construction & Mason Services Pvt. Ltd., a registered masonry contractor operating in New Delhi, India, for the complete mason work as detailed below. The scope encompasses all brickwork, blockwork, plastering, and associated mason activities required for the structural and finishing phases of the residential building at the above-mentioned location in New Delhi.
3. Itemized Cost Breakdown| Sr. No. | Description of Mason Work | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|
| 1 | Brick masonry work (1:4 cement mortar) – External walls, 9-inch thickness | sqm | 1,250 | ₹485 | ₹6,06,250 |
| 2 | Brick masonry work (1:4 cement mortar) – Internal partition walls, 4.5-inch thickness | sqm | 2,100 | ₹395 | ₹8,29,500 |
| 3 | Concrete block masonry (8-inch) – Staircase walls and utility rooms | sqm | 480 | ₹425 | ₹2,04,000 |
| 4 | Internal plastering (1:6 cement mortar) – Both sides of all mason walls | sqm | 5,600 | ₹185 | ₹10,36,000 |
| 5 | External plastering (1:4 cement mortar) – Weather-facing surfaces | sqm | 1,800 | ₹225 | ₹4,05,000 |
| 6 | Lintel and sill mason work (RCC with brick infill) – All door and window openings | nos. | 85 | ₹3,200 | ₹2,72,000 |
| 7 | Chimney and flue mason work (fire-brick, 1:3 refractory mortar) | nos. | 4 | ₹18,500 | ₹74,000 |
| 8 | Site preparation, scaffolding, and mason crew mobilization/demobilization | lump sum | 1 | ₹1,50,000 | ₹1,50,000 |
| 9 | Quality inspection, curing, and finishing by senior mason supervisor | lump sum | 1 | ₹85,000 | ₹85,000 |
| Subtotal (INR) | ₹37,61,750 | ||||
| GST @ 18% (as applicable in New Delhi, India) | ₹6,77,115 | ||||
| Grand Total (INR) | ₹44,38,865 | ||||
- This Quotation Estimate is valid for thirty (30) calendar days from the date of issue. Beyond this period, rates may be revised to reflect current market conditions in New Delhi, India.
- Payment terms: 25% advance upon signing the work order, 50% upon completion of mason work up to the 2nd floor, and 25% upon final completion and handover.
- The mason crew shall consist of a minimum of 12 skilled masons, 4 helpers, and 1 senior mason supervisor per shift. Working hours shall be 07:00 to 17:00 IST, Monday through Saturday.
- All mason work shall comply with the Bureau of Indian Standards (BIS) codes, the Delhi Municipal Corporation (DMC) building bylaws, and applicable Indian construction regulations.
- The client shall provide a safe and accessible work site in New Delhi, including water supply, electricity, and material storage area.
- Any variation or change order in the scope of mason work must be approved in writing by both parties before execution. Additional work will be billed at the rates specified in this Quotation Estimate.
- Defect liability period for mason work: twelve (12) months from the date of practical completion. Any cracks, efflorescence, or plaster failures within this period shall be rectified at no additional cost.
- This Quotation Estimate does not constitute a binding contract until a formal work order or agreement is executed by both parties.
- Disputes arising from this Quotation Estimate shall be resolved through arbitration in New Delhi, India, in accordance with the Arbitration and Conciliation Act, 1996.
By signing below, the client acknowledges receipt of this Quotation Estimate for mason work in New Delhi, India, and agrees to the terms, conditions, and pricing outlined herein. The mason services shall commence upon receipt of the advance payment and a signed work order.
For Shri Ram Construction & Mason Services Pvt. Ltd.Authorized Signatory
Name: Rajesh Kumar Sharma
Designation: Project Director
Date: _______________ For M/s. Gupta Residential Developers LLP
Authorized Signatory
Name: _______________________
Designation: _______________________
Date: _______________ ⬇️ Download as DOCX Edit online as DOCX
Create your own Word template with our GoGPT AI prompt:
GoGPT