Masonry Construction Services | Nepal Kathmandu

Professional Mason Work & Bricklaying Solutions

Prepared By:
Himalayan Mason & Construction Services Pvt. Ltd.
Boudha, Kathmandu, Nepal
Phone: +977-1-4412345
Email: [email protected]
Quotation No.: HMCS/2025/0487
Date: 15 June 2025
Valid Until: 15 July 2025
Project Location: Kathmandu, Nepal
Client Information
Client Name: Mr. Rajesh Shrestha Project Address: New Baneshwor, Kathmandu, Nepal
Contact Number: +977-9841234567 Project Type: Residential Mason Construction (3-Storey Building)
Scope of Mason Work – Nepal Kathmandu Project

This Quotation Estimate is prepared for comprehensive mason work services to be executed in the Kathmandu Valley, Nepal. Our team of skilled masons will handle all bricklaying, block masonry, plastering, and finishing works as detailed below. The mason crew will operate in accordance with Nepal Building Code (NBC) standards and local Kathmandu municipal regulations.

Itemized Quotation Estimate – Mason Services
Sr. No. Description of Mason Work Unit Quantity Rate (NPR) Amount (NPR)
1 Brick masonry work (1st storey) – 4" thick walls, cement mortar 1:6, including skilled mason labour and scaffolding SQM 285 1,850 527,250
2 Brick masonry work (2nd storey) – 4" thick walls, cement mortar 1:6, including mason crew supervision SQM 260 1,900 494,000
3 Brick masonry work (3rd storey) – 4" thick walls, cement mortar 1:6, including mason labour SQM 240 1,950 468,000
4 Internal plastering (both sides) – 12mm thick, cement mortar 1:4, skilled mason finishing SQM 1,120 680 761,600
5 External plastering – 15mm thick, cement mortar 1:4, weather-resistant mason application SQM 420 750 315,000
6 Partition wall masonry (internal) – 2" thick brick, cement mortar 1:6 SQM 180 1,450 261,000
7 Staircase masonry work – brick risers and treads, including mason finishing RM 45 2,200 99,000
8 Foundation masonry – rubble stone with cement mortar 1:5, mason crew of 8 workers CU 32 3,800 121,600
9 Chimney and ventilation shaft masonry – 4" brick, fire-rated mason work RM 28 2,500 70,000
10 Mason crew supervision and quality inspection – full project duration in Kathmandu Month 4 45,000 180,000
TOTAL QUOTATION ESTIMATE AMOUNT 3,297,450
Note: This Quotation Estimate for mason work in Nepal Kathmandu includes all skilled mason labour, supervision, and standard tools. Materials (bricks, cement, sand, aggregate) are to be procured separately by the client unless otherwise agreed in writing. Rates are quoted in Nepalese Rupees (NPR) and are subject to revision if material costs fluctuate by more than 10% during the project period. Payment Schedule
Milestone Percentage Amount (NPR)
Advance payment upon signing this Quotation Estimate 20% 659,490
Completion of 1st storey mason work 25% 824,363
Completion of 2nd and 3rd storey mason work 30% 989,235
Completion of plastering and finishing 15% 494,618
Final handover and mason crew demobilization 10% 329,744
Terms and Conditions
  • This Quotation Estimate is valid for 30 days from the date of issue. After expiry, rates for mason work in Nepal Kathmandu may be revised based on prevailing labour and material market conditions.
  • The mason crew will consist of a minimum of 12 skilled masons, 4 helpers, and 1 site supervisor assigned to the Kathmandu project site.
  • Project duration is estimated at 4 months (120 working days) from the date of commencement, subject to weather conditions in the Kathmandu Valley.
  • All mason work shall comply with Nepal Building Code (NBC) 2015 and Kathmandu Metropolitan City (KMC) building regulations.
  • The client shall provide a safe and accessible work site, water supply, and electricity connection at the project location in Kathmandu.
  • Any additional mason work beyond the scope described in this Quotation Estimate shall be charged at the prevailing daily rate of NPR 1,500 per mason per day.
  • Disputes arising from this Quotation Estimate shall be resolved through arbitration in Kathmandu, Nepal, in accordance with Nepalese law.
  • The mason crew shall adhere to all safety protocols as mandated by the Department of Occupational Safety and Health, Nepal.
  • Warranty on mason work: 12 months from the date of final handover for any structural defects in bricklaying or plastering.
Acceptance and Authorization

By signing below, both parties acknowledge and accept the terms of this Quotation Estimate for mason work to be carried out in Nepal Kathmandu. This document serves as a binding agreement for the scope, rates, and conditions outlined herein.

For Himalayan Mason & Construction Services Pvt. Ltd.

Authorized Signatory
Name: Suresh Tamang
Designation: Project Director

For the Client

Client Signature
Name: Rajesh Shrestha
Date: _______________

Himalayan Mason & Construction Services Pvt. Ltd. | Boudha, Kathmandu, Nepal | Reg. No: 123456/078

This Quotation Estimate document is generated for mason work projects in Nepal Kathmandu. All rates are in Nepalese Rupees (NPR).

© 2025 Himalayan Mason & Construction Services Pvt. Ltd. All Rights Reserved.