Quotation Estimate Mason in Nigeria Abuja –Free Word Template Download with AI
Professional Mason & Masonry Services
Abuja, FCT, Nigeria
Document Reference: QE-ABJ-2025-0472
Prepared By:Apex Mason & Construction Ltd.
Plot 14, Gwarinpa Industrial Area
Abuja, FCT, Nigeria
Tel: +234 803 555 0192
Email: [email protected] Prepared For:
Mr. Chukwuma Okafor
22, Asokoro Close, Zone 6
Abuja, FCT, Nigeria
Tel: +234 812 774 3356
Email: [email protected] Quotation Estimate Details
| Quotation Estimate No.: | QE-ABJ-2025-0472 | Date Issued: | 12 June 2025 |
| Project Location: | Asokoro, Abuja, FCT, Nigeria | Validity Period: | 30 Days from Issue Date |
| Project Type: | Residential Mason & Masonry Works | Estimated Duration: | 14 Working Days |
This Quotation Estimate is issued by Apex Mason & Construction Ltd. to provide a comprehensive cost breakdown for professional Mason and masonry services to be executed at the client's residential property located in Asokoro, Nigeria Abuja. The scope encompasses all masonry-related tasks including but not limited to block laying, plastering, tiling, and structural finishing works. Our team of certified Mason professionals will ensure that all work meets the Nigerian Building and Road Works Corporation (NABRDC) standards applicable in the Federal Capital Territory.
Itemized Cost Breakdown| S/N | Description of Mason Work | Unit | Quantity | Unit Cost (NGN) | Total Cost (NGN) |
|---|---|---|---|---|---|
| 1 | Supply and laying of 6-inch concrete blocks for external walls (Mason work) | m² | 185 | 12,500 | 2,312,500 |
| 2 | Supply and laying of 4-inch concrete blocks for internal partition walls | m² | 120 | 9,800 | 1,176,000 |
| 3 | External plastering (two coats) by certified Mason team | m² | 185 | 7,200 | 1,332,000 |
| 4 | Internal plastering (two coats) including skimming | m² | 240 | 5,500 | 1,320,000 |
| 5 | Ceramic floor tiling (60cm x 60cm) – living room, kitchen, and 3 bedrooms | m² | 145 | 14,000 | 2,030,000 |
| 6 | Wall tiling for kitchen and 2 bathrooms (up to 2.1m height) | m² | 68 | 11,500 | 782,000 |
| 7 | Construction of 4m x 3m masonry gate structure with steel reinforcement | Lot | 1 | 850,000 | 850,000 |
| 8 | Skirting and window sill finishing (Mason decorative work) | lm | 95 | 3,800 | 361,000 |
| 9 | Site preparation, scaffolding, and Mason labour supervision | Lot | 1 | 450,000 | 450,000 |
| 10 | Waste removal and site cleanup upon completion | Lot | 1 | 180,000 | 180,000 |
| SUBTOTAL | 10,793,500 | ||||
| VAT (7.5% – Nigeria Abuja FCT Rate) | 809,513 | ||||
| GRAND TOTAL (NGN) | 11,603,013 | ||||
| Milestone | Percentage | Amount (NGN) | Trigger |
|---|---|---|---|
| Advance Payment | 40% | 4,641,205 | Upon acceptance of this Quotation Estimate |
| Mid-Project Payment | 35% | 4,061,055 | Upon completion of block laying and plastering |
| Final Payment | 25% | 2,900,753 | Upon final inspection and handover |
- This Quotation Estimate is valid for thirty (30) calendar days from the date of issue. After this period, prices may be revised to reflect current market conditions in Nigeria Abuja.
- All Mason work shall be carried out in strict compliance with the Nigerian Building Code and FCT Urban and Regional Planning Authority (FCTURPA) regulations.
- The client shall provide uninterrupted access to the site in Asokoro, Abuja, and ensure that all necessary permits and approvals are obtained prior to commencement of masonry works.
- Any additional work or variation requested by the client beyond the scope outlined in this Quotation Estimate shall be subject to a separate written amendment and additional cost assessment.
- Apex Mason & Construction Ltd. provides a twelve (12) month workmanship warranty on all masonry and finishing works completed under this Quotation Estimate.
- Payment shall be made via bank transfer to the company account. No cash payments shall be accepted for any portion of this Quotation Estimate.
- The project timeline of fourteen (14) working days assumes normal weather conditions in Abuja. Delays caused by the rainy season or force majeure events shall extend the timeline proportionally.
- All materials specified in this Quotation Estimate shall be sourced from reputable suppliers within the Nigeria Abuja metropolitan area to ensure quality and timely delivery.
- The client acknowledges that the Mason team will operate between 7:00 AM and 5:00 PM, Monday through Saturday, in accordance with local labour practices in the FCT.
- Disputes arising from this Quotation Estimate shall be resolved through mediation in Abuja, Nigeria, in accordance with the laws of the Federal Republic of Nigeria.
By signing below, both parties acknowledge and agree to the terms, conditions, and pricing outlined in this Quotation Estimate for Mason and masonry services to be executed in Nigeria Abuja.
For: Apex Mason & Construction Ltd.Name: Engr. Ibrahim Danjuma
Title: Lead Mason & Project Director
Date: _______________ For: The Client
Name: Mr. Chukwuma Okafor
Title: Property Owner
Date: _______________ ⬇️ Download as DOCX Edit online as DOCX
Create your own Word template with our GoGPT AI prompt:
GoGPT