GoGPT GoSearch New DOC New XLS New PPT

OffiDocs favicon

Quotation Estimate Mason in Nigeria Abuja –Free Word Template Download with AI

Professional Mason & Masonry Services

Abuja, FCT, Nigeria

Document Reference: QE-ABJ-2025-0472

Prepared By:
Apex Mason & Construction Ltd.
Plot 14, Gwarinpa Industrial Area
Abuja, FCT, Nigeria
Tel: +234 803 555 0192
Email: [email protected]
Prepared For:
Mr. Chukwuma Okafor
22, Asokoro Close, Zone 6
Abuja, FCT, Nigeria
Tel: +234 812 774 3356
Email: [email protected]
Quotation Estimate Details
Quotation Estimate No.: QE-ABJ-2025-0472 Date Issued: 12 June 2025
Project Location: Asokoro, Abuja, FCT, Nigeria Validity Period: 30 Days from Issue Date
Project Type: Residential Mason & Masonry Works Estimated Duration: 14 Working Days
Scope of Work – Mason Services in Nigeria Abuja

This Quotation Estimate is issued by Apex Mason & Construction Ltd. to provide a comprehensive cost breakdown for professional Mason and masonry services to be executed at the client's residential property located in Asokoro, Nigeria Abuja. The scope encompasses all masonry-related tasks including but not limited to block laying, plastering, tiling, and structural finishing works. Our team of certified Mason professionals will ensure that all work meets the Nigerian Building and Road Works Corporation (NABRDC) standards applicable in the Federal Capital Territory.

Itemized Cost Breakdown
S/N Description of Mason Work Unit Quantity Unit Cost (NGN) Total Cost (NGN)
1 Supply and laying of 6-inch concrete blocks for external walls (Mason work) m² 185 12,500 2,312,500
2 Supply and laying of 4-inch concrete blocks for internal partition walls m² 120 9,800 1,176,000
3 External plastering (two coats) by certified Mason team m² 185 7,200 1,332,000
4 Internal plastering (two coats) including skimming m² 240 5,500 1,320,000
5 Ceramic floor tiling (60cm x 60cm) – living room, kitchen, and 3 bedrooms m² 145 14,000 2,030,000
6 Wall tiling for kitchen and 2 bathrooms (up to 2.1m height) m² 68 11,500 782,000
7 Construction of 4m x 3m masonry gate structure with steel reinforcement Lot 1 850,000 850,000
8 Skirting and window sill finishing (Mason decorative work) lm 95 3,800 361,000
9 Site preparation, scaffolding, and Mason labour supervision Lot 1 450,000 450,000
10 Waste removal and site cleanup upon completion Lot 1 180,000 180,000
SUBTOTAL 10,793,500
VAT (7.5% – Nigeria Abuja FCT Rate) 809,513
GRAND TOTAL (NGN) 11,603,013
Note: This Quotation Estimate is specific to the project location in Nigeria Abuja and accounts for local material sourcing from Gwarinpa and Wuse commercial markets. Prices are subject to fluctuation based on cement and block availability in the FCT market. Payment Schedule
Milestone Percentage Amount (NGN) Trigger
Advance Payment 40% 4,641,205 Upon acceptance of this Quotation Estimate
Mid-Project Payment 35% 4,061,055 Upon completion of block laying and plastering
Final Payment 25% 2,900,753 Upon final inspection and handover
Terms and Conditions
  1. This Quotation Estimate is valid for thirty (30) calendar days from the date of issue. After this period, prices may be revised to reflect current market conditions in Nigeria Abuja.
  2. All Mason work shall be carried out in strict compliance with the Nigerian Building Code and FCT Urban and Regional Planning Authority (FCTURPA) regulations.
  3. The client shall provide uninterrupted access to the site in Asokoro, Abuja, and ensure that all necessary permits and approvals are obtained prior to commencement of masonry works.
  4. Any additional work or variation requested by the client beyond the scope outlined in this Quotation Estimate shall be subject to a separate written amendment and additional cost assessment.
  5. Apex Mason & Construction Ltd. provides a twelve (12) month workmanship warranty on all masonry and finishing works completed under this Quotation Estimate.
  6. Payment shall be made via bank transfer to the company account. No cash payments shall be accepted for any portion of this Quotation Estimate.
  7. The project timeline of fourteen (14) working days assumes normal weather conditions in Abuja. Delays caused by the rainy season or force majeure events shall extend the timeline proportionally.
  8. All materials specified in this Quotation Estimate shall be sourced from reputable suppliers within the Nigeria Abuja metropolitan area to ensure quality and timely delivery.
  9. The client acknowledges that the Mason team will operate between 7:00 AM and 5:00 PM, Monday through Saturday, in accordance with local labour practices in the FCT.
  10. Disputes arising from this Quotation Estimate shall be resolved through mediation in Abuja, Nigeria, in accordance with the laws of the Federal Republic of Nigeria.
Acceptance and Authorization

By signing below, both parties acknowledge and agree to the terms, conditions, and pricing outlined in this Quotation Estimate for Mason and masonry services to be executed in Nigeria Abuja.

For: Apex Mason & Construction Ltd.
Name: Engr. Ibrahim Danjuma
Title: Lead Mason & Project Director
Date: _______________
For: The Client
Name: Mr. Chukwuma Okafor
Title: Property Owner
Date: _______________

Apex Mason & Construction Ltd. | RC: 1847293 | Abuja, FCT, Nigeria

This Quotation Estimate document is generated electronically and is valid without a physical stamp.

© 2025 Apex Mason & Construction Ltd. All Rights Reserved.

⬇️ Download as DOCX Edit online as DOCX

Create your own Word template with our GoGPT AI prompt:

GoGPT
×
Advertisement
❤️Shop, book, or buy here — no cost, helps keep services free.