Quotation Estimate Mason in Uganda Kampala –Free Word Template Download with AI
P.O. Box 4521, Kampala, Uganda
Tel: +256 772 345 678 | Email: [email protected]
Uganda Registration No. 012-345678 | TIN: 100-234-567-000
Quotation EstimateQuotation Details
Quotation No.: QTE-KPL-2025-0847
Date Issued: 14 June 2025
Valid Until: 14 July 2025 (30 days)
Project Location: Kampala, Uganda
Client Information
Client Name: Mr. David Okello
Address: Plot 14, Ntinda Road, Kampala, Uganda
Contact: +256 701 987 654
Email: [email protected]
Dear Mr. Okello,
Thank you for your enquiry regarding masonry and structural construction services in Uganda Kampala. This Quotation Estimate has been prepared by our experienced Mason team to provide you with a comprehensive and transparent breakdown of all costs associated with the proposed masonry works at your residential property in Ntinda, Kampala. Our Mason crew has assessed the site on 10 June 2025 and this Quotation Estimate reflects the full scope of work required to complete the project to the highest standards of Ugandan building codes and regulations.
Scope of Mason WorkThis Quotation Estimate covers the complete masonry construction of a two-storey residential building in Uganda Kampala, including foundation walls, ground floor and first floor blockwork, lintels, columns, and finishing. Our lead Mason, with over 18 years of experience in Kampala's construction industry, will supervise all works personally. The masonry works will be executed using standard 9-inch and 6-inch concrete blocks sourced from approved suppliers within Kampala district.
Itemized Cost Breakdown| Item No. | Description of Mason Work | Unit | Quantity | Unit Rate (UGX) | Amount (UGX) |
|---|---|---|---|---|---|
| 1 | Foundation wall masonry (9-inch blocks, cement mortar 1:4) | m² | 185 | 45,000 | 8,325,000 |
| 2 | Ground floor external wall masonry (9-inch blocks) | m² | 320 | 52,000 | 16,640,000 |
| 3 | Ground floor internal partition walls (6-inch blocks) | m² | 210 | 38,000 | 7,980,000 |
| 4 | First floor external wall masonry (9-inch blocks) | m² | 295 | 55,000 | 16,225,000 |
| 5 | First floor internal partition walls (6-inch blocks) | m² | 195 | 40,000 | 7,800,000 |
| 6 | Reinforced concrete lintels (door and window openings) | nos | 28 | 85,000 | 2,380,000 |
| 7 | Reinforced concrete columns (400mm x 400mm, C25 concrete) | nos | 16 | 450,000 | 7,200,000 |
| 8 | Ring beam and roof slab edge masonry | m | 96 | 65,000 | 6,240,000 |
| 9 | Internal plastering (both sides, 12mm thick, cement:sand 1:3) | m² | 1,200 | 28,000 | 33,600,000 |
| 10 | External plastering and rendering (weatherproof finish) | m² | 615 | 35,000 | 21,525,000 |
| 11 | Scaffolding, formwork, and temporary works | lump sum | 1 | 3,500,000 | 3,500,000 |
| 12 | Site supervision by senior Mason and project engineer | months | 5 | 1,200,000 | 6,000,000 |
| TOTAL ESTIMATED COST (UGX) | 137,415,000 | ||||
Grand Total in Ugandan Shillings: UGX 137,415,000 (One Hundred and Thirty-Seven Million, Four Hundred and Fifteen Thousand Ugandan Shillings Only)
Approximate USD Equivalent: USD 36,800 (at prevailing exchange rate)
Payment ScheduleThis Quotation Estimate for masonry works in Uganda Kampala is structured with the following milestone-based payment plan to ensure transparency and mutual confidence between our Mason team and the client:
| Milestone | Percentage | Amount (UGX) | Trigger |
|---|---|---|---|
| Advance / Mobilization | 20% | 27,483,000 | Upon signing of contract |
| Foundation & Ground Floor Walls Complete | 30% | 41,224,500 | Inspection sign-off |
| First Floor Walls & Lintels Complete | 25% | 34,353,750 | Inspection sign-off |
| Plastering & Finishing Complete | 20% | 27,483,000 | Final inspection |
| Retention / Defects Liability | 5% | 6,870,750 | After 90-day defect period |
- This Quotation Estimate is valid for thirty (30) calendar days from the date of issue. Prices are subject to revision after the expiry date due to fluctuations in material costs in the Kampala market.
- All masonry works will be carried out in strict compliance with the Uganda National Building Regulations and the Kampala Capital City Authority (KCCA) building bylaws.
- The Mason team shall provide all labour, tools, and small equipment. The client is responsible for the supply of major materials (cement, blocks, sand, aggregate, and reinforcement steel) unless otherwise agreed in writing.
- The estimated project duration is five (5) months from the date of commencement, subject to weather conditions and timely availability of materials in Uganda Kampala.
- Any variation or additional masonry work beyond the scope described in this Quotation Estimate shall be subject to a separate written variation order signed by both parties.
- The Mason contractor shall maintain adequate insurance coverage for workmen's compensation and third-party liability throughout the duration of the project.
- Disputes arising from this Quotation Estimate or the resulting contract shall be resolved through mediation in Kampala, Uganda, in accordance with the Arbitration Act of Uganda.
- The client shall provide safe access to the site, adequate water supply, and temporary power connections to facilitate the masonry works.
- A defects liability period of ninety (90) days shall apply from the date of practical completion, during which the Mason team shall rectify any defects in masonry workmanship at no additional cost.
By signing below, the client acknowledges receipt of this Quotation Estimate for masonry services in Uganda Kampala and agrees to the terms, conditions, and pricing outlined herein. The Mason contractor commits to delivering all works to the specified standards and within the agreed timeline.
For: Kampala Mason & Construction Services Ltd.Name: Eng. Samuel Mukasa (Lead Mason / Project Director)
Signature: _________________________
Date: _________________________ For: The Client
Name: Mr. David Okello
Signature: _________________________
Date: _________________________ ⬇️ Download as DOCX Edit online as DOCX