Quotation Estimate Mason in Uzbekistan Tashkent –Free Word Template Download with AI
| Client Name: | Uzbekistan National Development Authority |
| Project Location: | Chilonzor District, Tashkent, Uzbekistan |
| Project Reference: | Residential Complex – Phase II Masonry Works |
| Point of Contact: | Mr. Rustam Karimov, Project Director |
This Quotation Estimate is issued by Tashkent Mason & Construction Co. to provide a comprehensive and itemized cost breakdown for all Mason services required for the above-referenced residential project located in Uzbekistan Tashkent. The scope encompasses all masonry-related activities including but not limited to bricklaying, block wall construction, foundation masonry, plastering, tile setting, and structural reinforcement works. All work shall be executed in strict compliance with the national building codes of the Republic of Uzbekistan and the specific technical specifications outlined in the project documentation.
Our team of certified Mason professionals, with an average of fifteen years of experience in residential and commercial construction across Uzbekistan Tashkent, will be deployed to ensure the highest quality of workmanship. The masonry works will utilize locally sourced clay bricks, concrete blocks, and Portland cement conforming to GOST and Uzbek national standards.
| Item No. | Description of Mason Work | Unit | Quantity | Unit Rate (UZS) | Total (UZS) |
|---|---|---|---|---|---|
| 1 | Foundation masonry – reinforced concrete block laying (Grade C25/30) | m³ | 120 | 485,000 | 58,200,000 |
| 2 | External load-bearing wall construction – solid clay brick (250mm thick) | m² | 2,400 | 320,000 | 768,000,000 |
| 3 | Internal partition walls – aerated concrete block (100mm thick) | m² | 3,800 | 185,000 | 703,000,000 |
| 4 | Lintel and beam masonry – precast concrete elements installation | pcs | 185 | 95,000 | 17,575,000 |
| 5 | Internal plastering – cement-sand mortar (two-coat finish) | m² | 6,200 | 145,000 | 899,000,000 |
| 6 | External plastering – weather-resistant render with waterproofing | m² | 2,400 | 210,000 | 504,000,000 |
| 7 | Ceramic tile setting – bathrooms and kitchens (floor and wall) | m² | 1,150 | 275,000 | 316,250,000 |
| 8 | Staircase masonry – concrete steps with brick risers and treads | runs | 4 | 12,500,000 | 50,000,000 |
| 9 | Chimney and ventilation shaft masonry – firebrick construction | pcs | 12 | 3,800,000 | 45,600,000 |
| 10 | Site preparation, scaffolding, and mason equipment mobilization | lump sum | 1 | 85,000,000 | 85,000,000 |
| SUBTOTAL (All Mason Works) | 3,522,625,000 | ||||
| VAT (12% – Uzbekistan Standard Rate) | 422,715,000 | ||||
| GRAND TOTAL (UZS) | 3,945,340,000 | ||||
The total duration for completion of all Mason works as detailed in this Quotation Estimate is estimated at fourteen (14) calendar weeks from the date of contract signing. The schedule accounts for seasonal weather conditions typical of Uzbekistan Tashkent, including the hot summer months where curing times for mortar and concrete may be adjusted. A detailed Gantt chart and weekly progress reporting schedule will be provided upon contract execution.
- This Quotation Estimate is valid for thirty (30) calendar days from the date of issue. After the expiry date, all rates and material costs are subject to revision based on prevailing market conditions in Uzbekistan Tashkent.
- Payment terms: 30% advance payment upon contract signing, 40% upon completion of structural masonry (items 1–4), 20% upon completion of plastering and tile works (items 5–7), and 10% upon final handover and client acceptance.
- All payments shall be made in Uzbekistan Som (UZS) via bank transfer to the account of Tashkent Mason & Construction Co. registered with the Central Bank of the Republic of Uzbekistan.
- The Mason team shall provide a twelve-month workmanship warranty on all masonry works. Any defects arising from poor workmanship within this period shall be rectified at no additional cost to the client.
- Materials specified in this quotation are subject to availability. In the event of unavailability, equivalent or superior materials will be substituted with prior written approval from the client.
- All work shall comply with the Construction Code of the Republic of Uzbekistan, local Tashkent municipal regulations, and applicable GOST standards. The client is responsible for obtaining all necessary building permits and approvals prior to commencement.
- Force majeure events, including but not limited to natural disasters, government-mandated shutdowns, or supply chain disruptions specific to the Uzbekistan Tashkent region, shall extend the project timeline proportionally without penalty to either party.
- Disputes arising from this Quotation Estimate or the resulting contract shall be resolved through arbitration in Tashkent, Uzbekistan, in accordance with the rules of the Tashkent Arbitration Center.
- This document constitutes a non-binding Quotation Estimate until formally accepted in writing by both parties and converted into a binding construction contract.
By signing below, the client acknowledges receipt of this Quotation Estimate for Mason services in Uzbekistan Tashkent and agrees to the terms, conditions, and pricing outlined herein. This acceptance does not constitute a binding contract until a formal agreement is executed by both parties.
For Tashkent Mason & Construction Co.Name: Aziz Rahimov
Title: Chief Mason & Project Manager
Signature & Date: _________________________ For the Client
Name: Rustam Karimov
Title: Project Director