GoGPT GoSearch New DOC New XLS New PPT

OffiDocs favicon

Quotation Estimate Mason in Uzbekistan Tashkent –Free Word Template Download with AI

Professional Mason Services & Construction Works Uzbekistan Tashkent | Republic of Uzbekistan Quotation No.: QTE-TSK-2025-0487 Date of Issue: 15 June 2025 Validity Period: 30 Days Prepared By: Tashkent Mason & Construction Co. Address: 42 Amir Temur Avenue, Tashkent, Uzbekistan Contact: +998 71 200 4567 | [email protected]
Client Name: Uzbekistan National Development Authority
Project Location: Chilonzor District, Tashkent, Uzbekistan
Project Reference: Residential Complex – Phase II Masonry Works
Point of Contact: Mr. Rustam Karimov, Project Director

This Quotation Estimate is issued by Tashkent Mason & Construction Co. to provide a comprehensive and itemized cost breakdown for all Mason services required for the above-referenced residential project located in Uzbekistan Tashkent. The scope encompasses all masonry-related activities including but not limited to bricklaying, block wall construction, foundation masonry, plastering, tile setting, and structural reinforcement works. All work shall be executed in strict compliance with the national building codes of the Republic of Uzbekistan and the specific technical specifications outlined in the project documentation.

Our team of certified Mason professionals, with an average of fifteen years of experience in residential and commercial construction across Uzbekistan Tashkent, will be deployed to ensure the highest quality of workmanship. The masonry works will utilize locally sourced clay bricks, concrete blocks, and Portland cement conforming to GOST and Uzbek national standards.

Item No. Description of Mason Work Unit Quantity Unit Rate (UZS) Total (UZS)
1 Foundation masonry – reinforced concrete block laying (Grade C25/30) m³ 120 485,000 58,200,000
2 External load-bearing wall construction – solid clay brick (250mm thick) m² 2,400 320,000 768,000,000
3 Internal partition walls – aerated concrete block (100mm thick) m² 3,800 185,000 703,000,000
4 Lintel and beam masonry – precast concrete elements installation pcs 185 95,000 17,575,000
5 Internal plastering – cement-sand mortar (two-coat finish) m² 6,200 145,000 899,000,000
6 External plastering – weather-resistant render with waterproofing m² 2,400 210,000 504,000,000
7 Ceramic tile setting – bathrooms and kitchens (floor and wall) m² 1,150 275,000 316,250,000
8 Staircase masonry – concrete steps with brick risers and treads runs 4 12,500,000 50,000,000
9 Chimney and ventilation shaft masonry – firebrick construction pcs 12 3,800,000 45,600,000
10 Site preparation, scaffolding, and mason equipment mobilization lump sum 1 85,000,000 85,000,000
SUBTOTAL (All Mason Works) 3,522,625,000
VAT (12% – Uzbekistan Standard Rate) 422,715,000
GRAND TOTAL (UZS) 3,945,340,000

The total duration for completion of all Mason works as detailed in this Quotation Estimate is estimated at fourteen (14) calendar weeks from the date of contract signing. The schedule accounts for seasonal weather conditions typical of Uzbekistan Tashkent, including the hot summer months where curing times for mortar and concrete may be adjusted. A detailed Gantt chart and weekly progress reporting schedule will be provided upon contract execution.

  1. This Quotation Estimate is valid for thirty (30) calendar days from the date of issue. After the expiry date, all rates and material costs are subject to revision based on prevailing market conditions in Uzbekistan Tashkent.
  2. Payment terms: 30% advance payment upon contract signing, 40% upon completion of structural masonry (items 1–4), 20% upon completion of plastering and tile works (items 5–7), and 10% upon final handover and client acceptance.
  3. All payments shall be made in Uzbekistan Som (UZS) via bank transfer to the account of Tashkent Mason & Construction Co. registered with the Central Bank of the Republic of Uzbekistan.
  4. The Mason team shall provide a twelve-month workmanship warranty on all masonry works. Any defects arising from poor workmanship within this period shall be rectified at no additional cost to the client.
  5. Materials specified in this quotation are subject to availability. In the event of unavailability, equivalent or superior materials will be substituted with prior written approval from the client.
  6. All work shall comply with the Construction Code of the Republic of Uzbekistan, local Tashkent municipal regulations, and applicable GOST standards. The client is responsible for obtaining all necessary building permits and approvals prior to commencement.
  7. Force majeure events, including but not limited to natural disasters, government-mandated shutdowns, or supply chain disruptions specific to the Uzbekistan Tashkent region, shall extend the project timeline proportionally without penalty to either party.
  8. Disputes arising from this Quotation Estimate or the resulting contract shall be resolved through arbitration in Tashkent, Uzbekistan, in accordance with the rules of the Tashkent Arbitration Center.
  9. This document constitutes a non-binding Quotation Estimate until formally accepted in writing by both parties and converted into a binding construction contract.

By signing below, the client acknowledges receipt of this Quotation Estimate for Mason services in Uzbekistan Tashkent and agrees to the terms, conditions, and pricing outlined herein. This acceptance does not constitute a binding contract until a formal agreement is executed by both parties.

For Tashkent Mason & Construction Co.
Name: Aziz Rahimov
Title: Chief Mason & Project Manager
Signature & Date: _________________________
For the Client
Name: Rustam Karimov
Title: Project Director
Signature & Date: _________________________

Tashkent Mason & Construction Co. | 42 Amir Temur Avenue, Tashkent 100000, Republic of Uzbekistan
Registration No. 1000000000000 | Tax ID: 200123456
This Quotation Estimate document is generated electronically and is valid without a physical stamp.
© 2025 Tashkent Mason & Construction Co. All rights reserved.

⬇️ Download as DOCX Edit online as DOCX

Create your own Word template with our GoGPT AI prompt:

GoGPT
×
Advertisement
❤️Shop, book, or buy here — no cost, helps keep services free.