GoGPT GoSearch New DOC New XLS New PPT

OffiDocs favicon

Quotation Estimate Mechanical Engineer in Vietnam Ho Chi Minh City –Free Word Template Download with AI

Address: 128 Nguyen Van Linh Street, District 1, Ho Chi Minh City, Vietnam

Phone: +84 28 3822 4567 | Email: [email protected]

Tax Code (MST): 0312345678 | Website: www.saigonmechconsult.com

Quotation Estimate

Quotation Details

Quotation No.: QTE-2025-HCM-0472

Date of Issue: 15 June 2025

Validity Period: 30 days from date of issue

Project Location: Vietnam Ho Chi Minh City

Client Information

Company: [Client Company Name]

Address: [Client Address], Ho Chi Minh City, Vietnam

Contact Person: [Name]

Email: [Client Email]

Dear Sir/Madam,

Thank you for your inquiry regarding professional engineering services. We are pleased to present this Quotation Estimate for the engagement of a qualified Mechanical Engineer to provide comprehensive design, analysis, and project management services for your facility located in Vietnam Ho Chi Minh City. This document outlines the full scope of work, associated costs, and terms governing our professional engagement. All pricing is quoted in Vietnamese Dong (VND) unless otherwise stated, and reflects current market rates applicable to the Ho Chi Minh City metropolitan area.

Scope of Services – Mechanical Engineer Engagement

The following Quotation Estimate covers the full spectrum of Mechanical Engineer services to be delivered on-site and remotely for your project in Vietnam Ho Chi Minh City. Our team of licensed and experienced mechanical engineers will provide the following deliverables:

No. Service Description Duration Unit Unit Rate (VND) Total (VND)
1 Mechanical system design and engineering drawings (HVAC, piping, structural supports) for the production facility in Vietnam Ho Chi Minh City 45 days Project 185,000,000 185,000,000
2 Thermal and fluid dynamics analysis for process equipment; CFD simulation and heat transfer calculations 20 days Project 95,000,000 95,000,000
3 On-site mechanical inspection and condition assessment of existing plant equipment in Ho Chi Minh City 10 days Day 12,000,000 120,000,000
4 Project management and coordination with local contractors, suppliers, and the District 1 Department of Construction 90 days Month 45,000,000 135,000,000
5 Preparation of technical documentation, compliance reports, and as-built drawings per Vietnamese building and industrial codes 15 days Project 65,000,000 65,000,000
6 Commissioning support and performance verification of installed mechanical systems 7 days Day 15,000,000 105,000,000
7 Training sessions for client's operations staff on mechanical system maintenance (2 sessions, 8 hours each) 2 sessions Session 18,000,000 36,000,000
8 Travel, accommodation, and local transportation within Vietnam Ho Chi Minh City for the Mechanical Engineer team 120 days Project 48,000,000 48,000,000
Subtotal 794,000,000
VAT (10%) 79,400,000
Grand Total (VND) 873,400,000

The total amount of this Quotation Estimate is VND 873,400,000 (Eight Hundred Seventy-Three Million Four Hundred Thousand Vietnamese Dong), inclusive of 10% Value Added Tax as mandated by the General Department of Taxation of Vietnam. This figure represents the complete cost for the Mechanical Engineer services described above, to be executed at your premises in Vietnam Ho Chi Minh City.

Terms and Conditions
  1. This Quotation Estimate is valid for a period of thirty (30) calendar days from the date of issue. Beyond this period, prices may be subject to revision due to fluctuations in material costs, labor rates, or regulatory changes within Ho Chi Minh City.
  2. Payment terms: 30% advance payment upon contract signing; 40% upon completion of design and analysis deliverables; 30% upon successful commissioning and handover of all documentation. All payments shall be made via bank transfer to our account at Vietcombank, Ho Chi Minh City branch.
  3. The Mechanical Engineer team assigned to this project shall hold valid professional licenses issued by the Ministry of Science and Technology of Vietnam and shall comply with all applicable national standards (TCVN) and international standards (ASME, ISO) as relevant to the project scope.
  4. All work shall be performed in accordance with the labor laws of the Socialist Republic of Vietnam and the specific regulations governing industrial and commercial construction in Ho Chi Minh City. The client is responsible for obtaining all necessary building permits, environmental impact assessments, and local approvals from the District People's Committee.
  5. Intellectual property: All design documents, calculations, and engineering reports produced under this engagement shall become the property of the client upon full payment. The Mechanical Engineer firm retains the right to use anonymized project data for internal reference and portfolio purposes.
  6. Force Majeure: Neither party shall be liable for delays or non-performance resulting from events beyond reasonable control, including but not limited to natural disasters, government-mandated shutdowns, or public health emergencies affecting operations in Vietnam Ho Chi Minh City.
  7. Dispute resolution: Any disputes arising from this Quotation Estimate or the subsequent contract shall be resolved amicably. Failing mutual agreement, disputes shall be submitted to the Arbitration Court of Ho Chi Minh City in accordance with Vietnamese law.
  8. This Quotation Estimate does not constitute a binding contract until both parties have executed a formal Service Agreement. The terms herein serve as the commercial basis for such an agreement.
Acceptance and Authorization

By signing below, the client acknowledges receipt of this Quotation Estimate and agrees to the terms, scope, and pricing outlined for the Mechanical Engineer services to be delivered in Vietnam Ho Chi Minh City. This acceptance authorizes Saigon Mechanical Engineering Consultancy Co., Ltd to proceed with mobilization of the engineering team.

For and on behalf of the Client:

Name: _________________________
Position: _________________________
Signature & Company Stamp: _________________________
Date: _________________________

For and on behalf of Saigon Mechanical Engineering Consultancy Co., Ltd:

Name: Nguyen Van Thanh
Position: Chief Mechanical Engineer / Director
Signature & Company Stamp: _________________________
Date: 15 June 2025

Quotation No. QTE-2025-HCM-0472 | Page 1 of 1

Issued by Saigon Mechanical Engineering Consultancy Co., Ltd – Ho Chi Minh City, Vietnam

This Quotation Estimate is a confidential commercial document intended solely for the named client. Unauthorized reproduction or distribution is prohibited.

⬇️ Download as DOCX Edit online as DOCX

Create your own Word template with our GoGPT AI prompt:

GoGPT
×
Advertisement
❤️Shop, book, or buy here — no cost, helps keep services free.