GoGPT GoSearch New DOC New XLS New PPT

OffiDocs favicon

Quotation Estimate Petroleum Engineer in Iraq Baghdad –Free Word Template Download with AI

Office: Al-Mansour District, Baghdad, Iraq | P.O. Box 4471, Baghdad 10011

Tel: +964-770-123-4567 | Email: [email protected] | CR No. 2024-08834

Quotation Estimate
Quotation No.:MEC/QE/2025/0047
Date of Issue:14 June 2025
Valid Until:14 July 2025 (30 calendar days)
Prepared For:North Oil Company – Baghdad Operations Directorate
Project Location:Iraq Baghdad – Al-Mansour & North Gas Field Perimeter
Prepared By:Eng. Khalid Al-Rashid, Senior Petroleum Engineer

This Quotation Estimate is issued by Mesopotamia Energy Consulting LLC to provide a comprehensive, itemized cost breakdown for the engagement of a qualified Petroleum Engineer to deliver technical advisory, reservoir evaluation, and production optimization services within the operational jurisdiction of Iraq Baghdad. The scope encompasses on-site field assessments, subsurface data interpretation, well performance diagnostics, and the preparation of detailed engineering reports in accordance with the Iraqi Ministry of Oil standards and international best practices.

The Petroleum Engineer proposed for this assignment holds a Master's degree in Petroleum Engineering from the University of Technology, Baghdad, with over twelve (12) years of progressive experience in Iraqi onshore and offshore reservoirs. The engineer is fully licensed by the Iraqi Engineers Syndicate (Baghdad Branch) and possesses valid security clearance for operations in the Baghdad Governorate.

Ref Description of Service Duration Unit Unit Rate (USD) Total (USD)
01Reservoir characterization and static model update for the North Gas Field perimeter, including core analysis review and petrophysical log interpretation.30 daysLump Sum18,500.0018,500.00
02Dynamic reservoir modeling and history matching using Eclipse / tNavigator software for 14 producing wells in the Baghdad sector.45 daysLump Sum27,000.0027,000.00
03Well performance diagnostics, nodal analysis, and artificial lift optimization for 8 underperforming wells.20 daysLump Sum12,800.0012,800.00
04Preparation of a comprehensive Production Enhancement Plan (PEP) with 5-year forecast, economic evaluation, and risk assessment.25 daysLump Sum15,200.0015,200.00
05On-site field visits to Baghdad operations (minimum 6 site days) including wellhead inspections, separator checks, and data collection.6 daysPer Day1,200.007,200.00
06Technical supervision and mentoring of 4 junior Iraqi engineers assigned to the Baghdad operations team.90 daysPer Month3,500.0010,500.00
07Preparation of 3 formal engineering reports (reservoir, production, and PEP) in English and Arabic, formatted per Iraqi Ministry of Oil template.3 reportsPer Report2,800.008,400.00
08Travel, local transportation, and per diem within Baghdad Governorate for the duration of the contract.120 daysPer Day85.0010,200.00
09Software licenses (Eclipse, tNavigator, Petrel) – annual subscription allocated to the Baghdad project team.12 monthsLump Sum9,600.009,600.00
10Contingency and miscellaneous engineering services (up to 5% of subtotal).—Lump Sum—4,350.00
SUBTOTAL (USD)124,250.00
VAT / Iraqi Tax (0% – Engineering services exempt)0.00
GRAND TOTAL (USD)124,250.00
  • This Quotation Estimate assumes that all historical well data, core samples, and seismic volumes are made available by the client at the Baghdad operations office within the first five (5) working days of contract commencement.
  • The Petroleum Engineer will work a standard 48-hour week (Sunday to Thursday) in accordance with Iraqi labor regulations. Overtime beyond 10 hours per week will be billed at 1.5× the daily rate.
  • International airfare, visa processing, and accommodation outside Baghdad are excluded from this estimate and will be quoted separately if required.
  • Any scope expansion beyond the 14 wells and 8 underperforming wells listed above will be subject to a supplementary Quotation Estimate issued within 7 working days of the change request.
  • All deliverables are subject to review and approval by the North Oil Company Baghdad Operations Directorate within 10 working days of submission.
  • 30% advance payment upon signature of the contract and receipt of the signed Quotation Estimate.
  • 40% upon delivery and acceptance of the Reservoir Characterization Report and Dynamic Model (Milestone 1).
  • 20% upon delivery and acceptance of the Production Enhancement Plan (Milestone 2).
  • 10% upon final handover of all reports, data files, and close-out documentation.
  • All payments shall be made in US Dollars via wire transfer to the company's designated account in Baghdad within 30 days of invoice date.

This Quotation Estimate is valid for thirty (30) calendar days from the date of issue. Upon acceptance, the client shall sign and return a copy of this document, which will then serve as the basis for the formal Service Agreement. The Petroleum Engineer engagement is contingent upon the client's confirmation of site access permits within the Iraq Baghdad operational zone and completion of all security and insurance requirements.

For Mesopotamia Energy Consulting LLC

______________________________
Eng. Khalid Al-Rashid
Senior Petroleum Engineer / Project Lead
Date: _______________
For North Oil Company – Baghdad Operations

______________________________
Authorized Signatory
Name: _______________
Date: _______________

Mesopotamia Energy Consulting LLC | Al-Mansour District, Baghdad, Iraq | CR No. 2024-08834

This Quotation Estimate is confidential and intended solely for the named recipient. Unauthorized distribution is prohibited.

Page 1 of 1 | Document Ref: MEC/QE/2025/0047

⬇️ Download as DOCX Edit online as DOCX

Create your own Word template with our GoGPT AI prompt:

GoGPT
×
Advertisement
❤️Shop, book, or buy here — no cost, helps keep services free.