Quotation Estimate Petroleum Engineer in United Arab Emirates Abu Dhabi –Free Word Template Download with AI
Admiral Energy Solutions LLC
P.O. Box 45218, Al Markaziyah, United Arab Emirates Abu Dhabi
Tel: +971 2 555 0142 | Email: [email protected]
Trade License No. AD-2019-78453 | VAT No. 100234567800003
| Client Name: | Abu Dhabi National Oil Company (ADNOC) – Upstream Division |
| Project Site: | Onshore & Offshore Operations, United Arab Emirates Abu Dhabi |
| Point of Contact: | Eng. Khalid Al Mansoori – Senior Project Manager |
| Contact Email: | [email protected] |
This Quotation Estimate is issued by Admiral Energy Solutions LLC in response to the formal request for professional Petroleum Engineer services to be delivered within the jurisdiction of United Arab Emirates Abu Dhabi. The scope encompasses a comprehensive suite of reservoir engineering, drilling optimization, and production enhancement activities tailored to the client's active asset portfolio in the Abu Dhabi emirate.
The designated Petroleum Engineer shall hold a minimum of fifteen (15) years of progressive experience in hydrocarbon reservoir management, with demonstrated competence in both onshore and offshore operations characteristic of the United Arab Emirates Abu Dhabi geological formations. The engineer must be registered with the Abu Dhabi Department of Energy (DoE) and hold a valid professional license issued under the UAE regulatory framework.
| Item No. | Description of Service | Duration | Unit Rate (AED) | Amount (AED) |
|---|---|---|---|---|
| 01 | Reservoir Characterization & Static Modeling – Petroleum Engineer on-site assessment at Abu Dhabi field locations | 6 weeks | 18,500 / day | 4,380,000 |
| 02 | Dynamic Reservoir Simulation & History Matching – Offshore platform support, United Arab Emirates Abu Dhabi | 8 weeks | 21,000 / day | 6,720,000 |
| 03 | Well Performance Analysis & Inflow Performance Relationship (IPR) Studies | 4 weeks | 19,500 / day | 2,925,000 |
| 04 | Enhanced Oil Recovery (EOR) Feasibility Study & Pilot Design | 10 weeks | 22,500 / day | 9,000,000 |
| 05 | Drilling & Completion Optimization – Petroleum Engineer technical oversight | 5 weeks | 20,000 / day | 3,500,000 |
| 06 | Monthly Technical Reporting & Client Presentation – Abu Dhabi HQ | 33 months | 8,500 / month | 280,500 |
| 07 | Travel, Accommodation & Per Diem within United Arab Emirates Abu Dhabi | 33 months | 4,200 / month | 138,600 |
| 08 | Software Licensing (Petrel, Eclipse, CMG) & Computational Resources | 33 months | 12,000 / month | 396,000 |
| Subtotal (AED) | 27,340,100 | |||
| VAT @ 5% (UAE) | 1,367,005 | |||
| TOTAL ESTIMATED COST (AED) | 28,707,105 | |||
- This Quotation Estimate is valid for thirty (30) calendar days from the date of issue. Any acceptance beyond this period requires written reconfirmation of pricing by Admiral Energy Solutions LLC.
- All rates quoted are in United Arab Emirates Dirhams (AED) and are inclusive of the assigned Petroleum Engineer's professional fees, technical supervision, and deliverable preparation. Rates are exclusive of VAT, which is applied at the prevailing UAE rate of 5%.
- The Petroleum Engineer shall comply with all applicable regulations of the Abu Dhabi Department of Energy, the UAE Ministry of Energy and Infrastructure, and all site-specific HSE (Health, Safety, and Environment) protocols in force at the United Arab Emirates Abu Dhabi operating locations.
- Payment terms: 30% advance mobilization upon contract execution; 60% in monthly progress payments based on certified deliverables; 10% retention released upon final project acceptance and handover.
- Payment shall be made via bank transfer to the account designated in the contract annexure within fifteen (15) business days of invoice receipt. Late payments shall attract interest at 1.5% per month.
- The Quotation Estimate assumes standard working hours of 8 hours per day, 5 days per week. Overtime beyond these hours shall be billed at 1.5x the daily rate, subject to prior written approval by the client's project manager.
- Intellectual property generated during the engagement, including all reservoir models, simulation results, and technical reports, shall vest exclusively in the client upon full payment. The Petroleum Engineer retains the right to reference the project in professional portfolios with client consent.
- Force majeure events, including but not limited to extreme weather conditions affecting offshore operations in United Arab Emirates Abu Dhabi, shall suspend performance obligations without penalty to either party.
- This Quotation Estimate does not constitute a binding contract until a formal Service Agreement is executed by both parties. All terms herein are subject to the final contract documentation.
- Disputes arising from this engagement shall be resolved through arbitration in Abu Dhabi in accordance with the UAE Federal Arbitration Law, with the seat of arbitration in the United Arab Emirates Abu Dhabi.
For and on behalf of Admiral Energy Solutions LLC
Name: Eng. Sarah Al Farsi
Title: Chief Petroleum Engineer / Director
Date: _______________
For and on behalf of the Client
Name: Eng. Khalid Al Mansoori
Title: Senior Project Manager, ADNOC Upstream
Date: _______________
Create your own Word template with our GoGPT AI prompt:
GoGPT