GoGPT GoSearch New DOC New XLS New PPT

OffiDocs favicon

Quotation Estimate Plumber in Indonesia Jakarta –Free Word Template Download with AI

Professional Plumber Services — Indonesia Jakarta

Service Provider

Jakarta AquaFlow Plumbing Co., Ltd.

Jl. Sudirman Kav. 52-53, SCBD District

South Jakarta 12190, Indonesia

Tel: +62 21 520 8844

Email: [email protected]

NIB: 12.345.678.901

Client / Recipient

PT. Nusantara Property Management

Jl. Jend. Sudirman No. 28, Menteng

Central Jakarta 10310, Indonesia

Attn: Mr. Budi Santoso, Facilities Manager

Tel: +62 21 390 5511

Email: [email protected]

Quotation Estimate No.: QTE-JKT-2025-0417 Date Issued: 17 June 2025
Valid Until: 17 July 2025 (30 days) Project Location: Indonesia Jakarta — South Jakarta
Service Category: Commercial Plumber Maintenance & Repair Currency: IDR (Indonesian Rupiah)

This Quotation Estimate is issued by Jakarta AquaFlow Plumbing Co., Ltd. to PT. Nusantara Property Management for the provision of comprehensive Plumber services at the client’s commercial property located in Indonesia Jakarta. The scope encompasses inspection, repair, replacement, and preventive maintenance of all plumbing infrastructure within the building, including but not limited to water supply lines, drainage systems, sanitary fixtures, water heaters, and backflow prevention devices. All work shall comply with the Indonesian National Standard (SNI) for plumbing installations and the local regulations of the DKI Jakarta Provincial Government.

No. Description of Plumber Service Unit Qty Unit Price (IDR) Subtotal (IDR)
1 Full plumbing system inspection and diagnostic assessment (all floors, 12 storeys) Job 1 8,500,000 8,500,000
2 Replacement of corroded galvanized steel water supply pipes (DN 25 & DN 50) with PPR pipes Running meter 120 450,000 54,000,000
3 Repair and resealing of 14 leaking floor drains and 6 clogged main sewer lines (hydro-jetting) Job 1 12,750,000 12,750,000
4 Replacement of 8 commercial-grade water heaters (200L capacity, gas type) including installation Unit 8 6,200,000 49,600,000
5 Installation of 4 new backflow prevention valves on main water intake (SNI 03-6399 compliant) Unit 4 3,800,000 15,200,000
6 Quarterly preventive maintenance contract (4 visits per year) — first year Year 1 18,000,000 18,000,000
7 Emergency 24/7 on-call Plumber response service (Indonesia Jakarta coverage area) Year 1 9,500,000 9,500,000
8 Disposal of old pipes, fixtures, and hazardous waste in accordance with Jakarta DLH regulations Job 1 4,200,000 4,200,000
SUBTOTAL (IDR) 171,750,000
VAT 11% (PPN) — Indonesia 18,892,500
TOTAL QUOTATION ESTIMATE (IDR) 190,642,500
Note: All prices in this Quotation Estimate are quoted in Indonesian Rupiah (IDR) and include the 11% Value Added Tax (Pajak Pertambahan Nilai / PPN) as mandated by the Republic of Indonesia tax authority (DJP). Prices are exclusive of any additional work not explicitly listed above. Mobilization and demobilization costs within the Indonesia Jakarta metropolitan area are included.
  1. This Quotation Estimate is valid for a period of thirty (30) calendar days from the date of issue. After the expiry date, the Plumber service provider reserves the right to revise pricing due to material cost fluctuations in the Indonesia Jakarta market.
  2. Payment terms: 40% advance payment upon acceptance of this Quotation Estimate, 40% upon completion of all repair and replacement works, and 20% upon successful handover and sign-off of the preventive maintenance schedule.
  3. All Plumber work shall be performed by licensed and certified technicians holding valid K3 (Keselamatan dan Kesehatan Kerja) certification as required by Indonesian labour regulations.
  4. The service provider guarantees all workmanship for a period of twelve (12) months from the date of completion. Material warranties are subject to the respective manufacturer’s terms.
  5. Work schedule: All major plumbing works shall be carried out between 08:00 and 17:00 WIB (Western Indonesia Time) on weekdays. Emergency Plumber response in Indonesia Jakarta shall be available 24 hours a day, 7 days a week, with an on-site arrival time not exceeding 90 minutes.
  6. Any variation or additional scope of work beyond this Quotation Estimate must be approved in writing by both parties before execution. A supplementary Quotation Estimate will be issued for such variations.
  7. The client shall provide safe access to all areas of the property, including mechanical rooms, roof access, and basement levels, to enable the Plumber team to perform the work without obstruction.
  8. Disputes arising from this Quotation Estimate shall be resolved through amicable negotiation. If unresolved, the matter shall be submitted to the Commercial Court of the District Court of South Jakarta, Indonesia.
  9. This Quotation Estimate does not constitute a binding contract until formally accepted in writing by both parties and a separate Service Agreement is executed.

Prepared By — Service Provider

Jakarta AquaFlow Plumbing Co., Ltd.

Name: Ir. Hendra Wijaya, P.M.M.
Position: Chief Plumber / Operations Director
Signature & Company Stamp

Accepted By — Client

PT. Nusantara Property Management

Name: Mr. Budi Santoso
Position: Facilities Manager
Signature & Company Stamp

This Quotation Estimate document was prepared for Plumber services in Indonesia Jakarta. © 2025 Jakarta AquaFlow Plumbing Co., Ltd. All rights reserved.

Document Reference: QTE-JKT-2025-0417 | Page 1 of 1

⬇️ Download as DOCX Edit online as DOCX

Create your own Word template with our GoGPT AI prompt:

GoGPT
×
Advertisement
❤️Shop, book, or buy here — no cost, helps keep services free.