Quotation Estimate Plumber in Kazakhstan Almaty –Free Word Template Download with AI

145 Abai Avenue, Office 312, Almaty, 050040, Kazakhstan

Tel: +7 (727) 355-88-21 | Email: [email protected]

BIN: 123456789012 | IIN: 987654321012

Quotation Estimate No.: QE-2025-0487

Date Issued: 15 June 2025

Valid Until: 15 July 2025

Professional Plumber Services — Residential & Commercial Plumbing Works in Kazakhstan Almaty

Prepared For (Client): Mr. Dauren Kassenov, 87 Zheltoksan Street, Apt. 14, Almaty, 050000, Kazakhstan
Project Location: Residential apartment, Almaty, Kazakhstan (Kazakhstan Almaty, Medeu District)
Service Category: Full Plumber Installation, Repair, and Maintenance
Currency: Kazakhstani Tenge (KZT)
Prepared By: Arman Tulegenov, Senior Plumber & Project Supervisor
1. Purpose of This Quotation Estimate

This Quotation Estimate is issued by Almaty AquaFlow Plumbing Services LLP to provide the client with a comprehensive, itemized cost breakdown for all Plumber services required at the specified residential property located in Kazakhstan Almaty. This document serves as a formal proposal outlining the scope of work, estimated labor hours, material costs, and associated fees. The Quotation Estimate is prepared in accordance with the Republic of Kazakhstan Construction and Housing Code and local Almaty municipal regulations governing plumbing installations and repairs.

2. Scope of Work — Plumber Services

The following Plumber tasks are included in this Quotation Estimate for the Kazakhstan Almaty property:

  • Complete removal and disposal of existing corroded copper and galvanized steel piping throughout the apartment (approximately 45 linear meters).
  • Installation of new PPR (polypropylene) plumbing system for cold and hot water supply lines, including all necessary fittings, valves, and connectors.
  • Replacement of the main water shut-off valve and installation of a new pressure-reducing valve at the building riser connection point.
  • Installation of a new 80-liter electric water heater (brand: Ariston, model: ABS VLS 80) with proper grounding and safety valve.
  • Replacement of all bathroom fixtures: ceramic toilet (Geberit), washbasin with mixer tap (Grohe), and shower cabin with thermostatic mixer (Hansgrohe).
  • Installation of a new kitchen sink with a 3-stage garbage disposal unit (InSinkErator) and under-sink plumbing connections.
  • Hydrostatic pressure testing of the entire new plumbing system at 1.5 times operating pressure for a minimum of 30 minutes to verify zero leakage.
  • Final commissioning, water flow verification, and handover documentation including warranty certificates for all installed Plumber components.
  • Removal of all construction debris and site cleanup upon completion of the Plumber works in Kazakhstan Almaty.
3. Itemized Cost Breakdown
Item No. Description of Plumber Work / Material Unit Qty Unit Price (KZT) Total (KZT)
1 Removal of old plumbing system (labor) Lot 1 185,000 185,000
2 PPR pipe system, fittings, and valves (materials) Lot 1 420,000 420,000
3 Installation of new PPR plumbing (labor) Lot 1 350,000 350,000
4 Main shut-off valve & pressure-reducing valve Set 1 95,000 95,000
5 Electric water heater 80L (Ariston ABS VLS 80) Piece 1 145,000 145,000
6 Bathroom fixtures (toilet, washbasin, shower cabin) Set 1 680,000 680,000
7 Kitchen sink & garbage disposal unit Set 1 210,000 210,000
8 Fixture installation & connection (labor) Lot 1 275,000 275,000
9 Hydrostatic pressure test & commissioning Lot 1 65,000 65,000
10 Debris removal & site cleanup Lot 1 45,000 45,000
Subtotal (Labor + Materials) 2,470,000 KZT
VAT (12% — Kazakhstan standard rate) 296,400 KZT
Grand Total 2,766,400 KZT
4. Terms and Conditions of This Quotation Estimate
  1. This Quotation Estimate is valid for 30 calendar days from the date of issue. After the expiry date, all prices for Plumber materials and labor in Kazakhstan Almaty are subject to revision based on current market rates.
  2. Payment terms: 40% advance payment upon acceptance of this Quotation Estimate, 40% upon completion of rough-in plumbing work, and 20% upon final handover and client sign-off.
  3. All Plumber work shall be performed in compliance with SNiP standards applicable in the Republic of Kazakhstan and Almaty city building codes.
  4. A warranty period of 24 months is provided on all labor performed by our Plumber team. Manufacturer warranties on equipment (water heater, fixtures, valves) are passed directly to the client.
  5. Any additional work not specified in this Quotation Estimate will be subject to a separate written amendment and client approval before commencement.
  6. The estimated project duration is 10–12 working days, subject to material availability and building management access permissions in Kazakhstan Almaty.
  7. This Quotation Estimate does not constitute a binding contract until both parties have signed the acceptance section below and the advance payment has been received.
5. Acceptance and Authorization

Client (Mr. Dauren Kassenov)

I hereby accept this Quotation Estimate for Plumber services in Kazakhstan Almaty and authorize Almaty AquaFlow Plumbing Services LLP to proceed with the works as described.

Signature / Date

Almaty AquaFlow Plumbing Services LLP

Issued and authorized by the undersigned Senior Plumber and Project Supervisor on behalf of the company.

Arman Tulegenov / Date

Almaty AquaFlow Plumbing Services LLP — Professional Plumber Services in Kazakhstan Almaty — Quotation Estimate QE-2025-0487

This document is generated electronically and is valid without a physical stamp. For inquiries, contact +7 (727) 355-88-21 or [email protected].