Quotation Estimate Plumber in Senegal Dakar –Free Word Template Download with AI
Professional Plumber & Plumbing Solutions
Route de Ngor, Zone Industrielle, Dakar, Senegal
Tel: +221 33 864 52 10 | Email: [email protected]
RC: SN-DKR-2019-45872 | NINEA: 004587200012
Reference: QTE-2025-DKR-0347
Date: 15 June 2025
Valid Until: 15 July 2025
Prepared For
Client Name: M. Ousmane Diop
Company: Diop Immobilier SARL
Address: Lot 245, Almadies, Dakar, Senegal
Contact: +221 77 654 32 10
Project Details
Project Location: Almadies, Dakar, Senegal
Property Type: 4-Unit Residential Building
Scope: Full Plumbing Installation & Repair
Estimated Duration: 12 Working Days
Scope of Work – Plumber Services in Senegal DakarThis Quotation Estimate is issued by Dakar AquaPro Services SARL, a licensed and certified Plumber operating in Senegal Dakar, to provide comprehensive plumbing installation, repair, and maintenance services for the above-referenced residential property. Our team of qualified Plumber technicians will execute all works in strict compliance with the Senegalese building codes, SDE (Société des Eaux du Sénégal) regulations, and the standards set forth by the Direction de la Construction et de l'Urbanisme of Dakar. All materials and labor are guaranteed to meet the highest quality standards appropriate for the tropical coastal climate of Senegal Dakar.
Itemized Quotation Estimate – Services & Materials| Ref | Description of Plumber Service / Material | Quantity | Unit | Unit Price (XOF) | Total (XOF) |
|---|---|---|---|---|---|
| 01 | Complete demolition and removal of existing corroded copper piping (ground floor to 3rd floor) | 1 | Lot | 185,000 | 185,000 |
| 02 | Supply and installation of PPR (Polypropylene Random) piping, 25mm diameter, SDR 11 – Senegal Dakar climate-rated | 320 | Meters | 4,500 | 1,440,000 |
| 03 | Supply and installation of PPR fittings, elbows, tees, and couplings (complete set) | 1 | Lot | 380,000 | 380,000 |
| 04 | Installation of 4 individual water meters (SDE-compliant) with shut-off valves | 4 | Units | 95,000 | 380,000 |
| 05 | Supply and installation of 4 electric water heaters (200L, 220V) – one per unit | 4 | Units | 275,000 | 1,100,000 |
| 06 | Installation of 8 sanitary fixtures (2 per unit: WC, basin, shower, kitchen sink) | 8 | Units | 145,000 | 1,160,000 |
| 07 | Complete drainage and sewage piping installation (PVC 110mm) with proper gradient to SDE main line | 1 | Lot | 620,000 | 620,000 |
| 08 | Installation of 4 rooftop water storage tanks (1,000L, UV-stabilized polyethylene) | 4 | Units | 165,000 | 660,000 |
| 09 | Pressure testing, leak detection, and hydrostatic validation of entire plumbing network | 1 | Lot | 250,000 | 250,000 |
| 10 | Site cleanup, waste disposal, and final handover documentation (Senegal Dakar municipal compliance) | 1 | Lot | 120,000 | 120,000 |
| 11 | Plumber labor – 12 working days (2 senior Plumber technicians + 2 apprentices) | 12 | Days | 85,000 | 1,020,000 |
| 12 | Permit fees and SDE connection authorization (Dakar municipal) | 1 | Lot | 175,000 | 175,000 |
| TOTAL QUOTATION ESTIMATE (XOF) | 7,490,000 | ||||
| TOTAL IN WORDS | Seven Million Four Hundred Ninety Thousand CFA Francs | ||||
1. Validity: This Quotation Estimate is valid for a period of thirty (30) calendar days from the date of issue. After this period, prices may be revised due to fluctuations in material costs in the Senegal Dakar market.
2. Payment Terms: A deposit of 40% (2,996,000 XOF) is due upon acceptance of this Quotation Estimate. A second payment of 40% (2,996,000 XOF) is due upon completion of 70% of the Plumber works. The final balance of 20% (1,498,000 XOF) is payable upon successful pressure testing and client sign-off.
3. Payment Method: All payments shall be made via bank transfer to Dakar AquaPro Services SARL, Bank: BICE Senegal, Account: 0001234567890, IBAN: SN08 0001 2345 6789 0000 1234 567, or by certified bank cheque payable to Dakar AquaPro Services SARL.
4. Warranty: All Plumber workmanship is guaranteed for a period of twenty-four (24) months from the date of final acceptance. All materials carry their respective manufacturer warranties. This warranty covers defects in workmanship and materials but does not cover damage caused by misuse, natural disasters, or unauthorized modifications.
5. Schedule: The estimated completion period is twelve (12) working days from the date of the first payment and site access. Delays caused by force majeure, SDE network interruptions, or client-requested changes will extend the timeline accordingly.
6. Compliance: All works shall comply with the Senegalese Code du Bâtiment, SDE technical specifications, and the urban planning regulations of the Ville de Dakar. Our Plumber team holds valid professional certifications issued by the Chambre de Métiers du Sénégal.
7. Exclusions: This Quotation Estimate does not include electrical wiring for water heaters (to be handled by a licensed electrician), structural modifications to the building, or any works outside the defined plumbing scope.
8. Dispute Resolution: Any disputes arising from this Quotation Estimate shall be resolved amicably. Failing mutual agreement, matters shall be submitted to the competent courts of Dakar, Senegal.
For Dakar AquaPro Services SARL
Authorized Plumber Representative
Name: M. Ibrahima Sow
Title: Chief Plumber / Director
For the Client
Accepted and Approved
Name: M. Ousmane Diop
Date: ___________________