GoGPT GoSearch New DOC New XLS New PPT

OffiDocs favicon

Quotation Estimate Plumber in Sudan Khartoum –Free Word Template Download with AI

Professional Plumber Services — Sudan Khartoum

Document No: QE-KRT-2025-0472
Issued By:
Nile Blue Plumbing & Water Solutions
Al-Murakba Street, Omdurman District
Khartoum, Sudan
Tel: +249-183-555-0192
Email: [email protected]
Quotation Estimate Details:
Date of Issue: 14 June 2025
Valid Until: 14 July 2025
Currency: Sudanese Pound (SDG)
Prepared For: Client (see below)
Field Details
Client Name / Organization Al-Rashid Residential Complex Management Office
Project Address Block C, Al-Rashid Housing, Al-Murakba, Khartoum, Sudan
Contact Person Eng. Mahmoud El-Tayeb
Contact Number +249-912-334-7801
Scope Reference Full plumbing system inspection, repair, and upgrade for 48 residential units

This Quotation Estimate is prepared by our certified Plumber team to address the comprehensive plumbing infrastructure needs of the Al-Rashid Residential Complex in Sudan Khartoum. The scope encompasses a full diagnostic inspection of all water supply lines, drainage systems, gas piping, and fixture installations across the 48 residential units. Our Plumber specialists will evaluate the condition of copper and PVC piping, identify corrosion, leaks, blockages, and pressure irregularities, and provide a detailed remediation plan. The work includes replacement of deteriorated pipe sections, installation of new water meters, repair of bathroom and kitchen fixtures, descaling of water heaters, and upgrading of the main distribution manifold to meet current Sudanese building codes applicable in Khartoum.

Item No. Description of Plumber Service Unit Qty Unit Price (SDG) Total (SDG)
01 Full plumbing system diagnostic inspection and pressure testing (all 48 units) Lot 1 185,000 185,000
02 Replacement of corroded copper supply pipes (15mm & 22mm), including fittings Metre 320 4,200 1,344,000
03 Replacement of PVC drainage pipes (50mm & 100mm) with solvent-welded joints Metre 210 3,100 651,000
04 Installation of new individual water meters (prepaid type, Khartoum Water Authority approved) Unit 48 12,500 600,000
05 Repair and resealing of bathroom fixtures (toilets, basins, shower heads) — all units Unit 48 8,700 417,600
06 Descaling, inspection, and repair of electric water heaters (40L capacity) Unit 48 6,300 302,400
07 Upgrading of main distribution manifold and installation of zone isolation valves Lot 1 245,000 245,000
08 Gas line inspection, leak testing, and replacement of worn flexible connectors Lot 1 98,000 98,000
09 Labour charges — certified Plumber team (2 senior plumbers, 3 apprentices) for 12 working days Day 12 38,000 456,000
10 Waste removal, site cleanup, and disposal of old materials per Khartoum municipal regulations Lot 1 42,000 42,000
Subtotal 4,341,000
VAT (10% — Sudan Khartoum applicable rate) 434,100
Grand Total (Quotation Estimate) 4,775,100 SDG

Upon acceptance of this Quotation Estimate, the Plumber team will mobilize to the site in Sudan Khartoum within five (5) working days. The estimated duration for full completion of all listed plumbing works is twelve (12) consecutive working days, subject to weather conditions and access availability. A daily progress report will be submitted to the client's management office at the end of each working day.

  • This Quotation Estimate is valid for thirty (30) calendar days from the date of issue. Prices are subject to revision after the validity period due to fluctuating material costs in the Sudan Khartoum market.
  • Payment terms: 40% advance payment upon signing, 40% upon completion of 70% of the work, and 20% upon final handover and client sign-off.
  • All materials used by our Plumber team shall be new, of certified quality, and compliant with Sudanese Standards and Specifications Organization (SSSO) requirements.
  • A warranty period of twelve (12) months is provided on all workmanship and installed materials. Any defects arising within this period will be rectified by our Plumber team at no additional cost to the client.
  • The client is responsible for providing safe access to all units, ensuring water supply can be isolated per unit, and coordinating with the Khartoum Water Authority for meter installation permits.
  • Any additional work beyond the scope defined in this Quotation Estimate will be subject to a separate written amendment and additional cost approval.
  • This Quotation Estimate does not constitute a binding contract until formally accepted in writing by both parties.

By signing below, the client acknowledges receipt of this Quotation Estimate for Plumber services in Sudan Khartoum and agrees to the terms, conditions, pricing, and timeline outlined herein. This signature authorizes Nile Blue Plumbing & Water Solutions to proceed with the described plumbing works upon receipt of the advance payment.

For: Nile Blue Plumbing & Water Solutions
Authorized Signatory / Lead Plumber
Name: _________________________
Date: _________________________
For: Al-Rashid Residential Complex
Client Representative
Name: _________________________
Date: _________________________

Nile Blue Plumbing & Water Solutions — Licensed Plumber Contractor, Khartoum, Sudan | License No: KRT-PLB-2019-0087
This Quotation Estimate document is generated electronically and is valid without a physical stamp. For inquiries, contact our office in Sudan Khartoum during business hours (Saturday to Thursday, 8:00 AM – 4:00 PM).

⬇️ Download as DOCX Edit online as DOCX

Create your own Word template with our GoGPT AI prompt:

GoGPT
×
Advertisement
❤️Shop, book, or buy here — no cost, helps keep services free.