GoGPT GoSearch New DOC New XLS New PPT

OffiDocs favicon

Quotation Estimate Welder in China Shanghai –Free Word Template Download with AI

Professional Welder Services & Equipment Supply

Prepared for Operations in China Shanghai

Quotation No.: QTE-SH-2025-0417

Date of Issue: 17 June 2025

Valid Until: 17 July 2025

Prepared By: Shanghai Industrial Welding Solutions Ltd.

Address: 88 Pudong New Area, China Shanghai, 200120

Contact: +86-21-5888-6720 | [email protected]

Client Name: [Client Company Name]

Project Site: China Shanghai, Yangpu District Industrial Zone

Project Reference: Structural Steel Fabrication – Phase II

Currency: CNY (Chinese Yuan)

Payment Terms: 40% Advance / 60% on Completion

Delivery Window: 21 Working Days

This Quotation Estimate is issued by Shanghai Industrial Welding Solutions Ltd. to provide a comprehensive cost breakdown for the engagement of certified Welder professionals and the supply of associated welding equipment for a structural steel fabrication project located in China Shanghai. The scope encompasses the full lifecycle of the Welder engagement, including pre-mobilization planning, on-site execution of welding operations, quality inspection, and post-completion reporting. All services described in this Quotation Estimate are tailored specifically to the regulatory, environmental, and industrial standards applicable to the China Shanghai metropolitan area.

The Welder team proposed under this Quotation Estimate consists of a minimum of six (6) certified welders holding valid Chinese National Welding Qualification Certificates (CNWQC) and international AWS/ISO 9606 certifications. Each Welder will be assigned to a specific structural zone within the China Shanghai project site to ensure continuity, accountability, and adherence to the project schedule. The Quotation Estimate accounts for the full duration of the Welder deployment, estimated at 21 working days, with a standard 8-hour shift per day and a 6-day working week in accordance with local labor regulations in China Shanghai.

Item No. Description Qty Unit Unit Price (CNY) Amount (CNY)
01 Certified Welder – Senior (AWS D1.1 / ISO 3834) – Daily Rate 4 Person-Day 1,850 155,640
02 Certified Welder – Intermediate (CNWQC Level II) – Daily Rate 2 Person-Day 1,350 56,700
03 Welding Equipment Package (MIG/TIG Machines, Gas Cylinders, Consumables) 6 Set 12,500 75,000
04 Personal Protective Equipment (PPE) for Welder – Full Kit 6 Set 2,200 13,200
05 Welding Consumables (Electrodes, Wire, Shielding Gas – Full Duration) 1 Lot 48,000 48,000
06 Quality Inspection & NDT (Radiographic / Ultrasonic) – Per Joint 320 Joint 185 59,200
07 Site Mobilization & Demobilization (China Shanghai Logistics) 1 Lot 22,000 22,000
08 Welding Procedure Specification (WPS) Development & PQR Testing 3 Procedure 8,500 25,500
09 Project Supervision & Welder Coordination (Site Engineer) 1 Person-Day 2,400 50,400
10 Insurance, Work Permits & Regulatory Compliance (China Shanghai) 1 Lot 15,000 15,000
Subtotal 520,640
VAT (13% – PRC Standard Rate) 67,683
TOTAL QUOTATION ESTIMATE AMOUNT 588,323

This Quotation Estimate is valid for a period of thirty (30) calendar days from the date of issue. All pricing is quoted in Chinese Yuan (CNY) and is inclusive of standard materials and labor as itemized above. The Quotation Estimate does not include any costs arising from scope changes, force majeure events, or additional Welder personnel beyond the quantities specified herein. Any variation to the scope of work will be subject to a revised Quotation Estimate issued in writing by Shanghai Industrial Welding Solutions Ltd.

All Welder personnel engaged under this Quotation Estimate shall comply with the Occupational Safety and Health regulations of the People's Republic of China, as well as the specific safety protocols mandated for industrial operations in China Shanghai. The client is responsible for providing safe access to the project site and ensuring that all structural elements are ready for welding operations prior to the commencement date.

Payment shall be made via bank transfer to the account designated in the commercial invoice. A 40% advance payment is required to confirm the Quotation Estimate and initiate the mobilization of the Welder team. The remaining 60% balance shall be due within fourteen (14) days of final acceptance and sign-off of the completed welding works in China Shanghai.

Shanghai Industrial Welding Solutions Ltd. provides a twelve (12) month warranty on all welding joints executed under this Quotation Estimate. The warranty covers defects in workmanship, porosity, incomplete fusion, and structural integrity failures attributable to the Welder's execution. Any warranty claims must be submitted in writing within the warranty period, and our technical team in China Shanghai will respond within 48 hours to assess and rectify any identified defects at no additional cost to the client.

By signing below, the client acknowledges and accepts the terms, conditions, and pricing outlined in this Quotation Estimate for the Welder services to be performed in China Shanghai. This document, once countersigned by both parties, constitutes a binding commercial agreement for the scope of work described herein.

Prepared By (Supplier) Accepted By (Client)

Name: ___________________________

Title: Project Director

Signature: _________________________

Date: ___________________________

Name: ___________________________

Title: ___________________________

Signature: _________________________

Date: ___________________________

Note: This Quotation Estimate is prepared exclusively for the named client and project site in China Shanghai. It shall not be reproduced, distributed, or used for any other purpose without the prior written consent of Shanghai Industrial Welding Solutions Ltd. All Welder certifications and equipment specifications referenced herein are subject to verification upon request.

Shanghai Industrial Welding Solutions Ltd. | 88 Pudong New Area, China Shanghai, 200120, PRC

Unified Social Credit Code: 91310115MA1K4XXXXX | Tel: +86-21-5888-6720 | Email: [email protected]

This Quotation Estimate document was generated on 17 June 2025. Document Reference: QTE-SH-2025-0417. Page 1 of 1.

⬇️ Download as DOCX Edit online as DOCX

Create your own Word template with our GoGPT AI prompt:

GoGPT
×
Advertisement
❤️Shop, book, or buy here — no cost, helps keep services free.