GoGPT GoSearch New DOC New XLS New PPT

OffiDocs favicon

Quotation Estimate Welder in DR Congo Kinshasa –Free Word Template Download with AI

Professional Welder Services & Equipment Supply

DR Congo Kinshasa — Industrial & Commercial Welding Solutions

Quotation No.: QTE-KIN-2025-0487
Date Issued: 14 June 2025
Valid Until: 14 July 2025
Prepared By: Kinshasa Industrial Welding Co.
Address: Avenue de la Paix, Gombe, Kinshasa
Contact: +243 990 000 000 | [email protected]
Field Details
Client Name Construction & Infrastructure Development Group (CIDG)
Project Location DR Congo Kinshasa — Matadi Industrial Zone, Commune de Matadi
Project Reference CIDG-KIN-2025-Steel-Frame-012
Point of Contact Mr. Jean-Pierre Mbuyi — Project Director

This Quotation Estimate is issued by Kinshasa Industrial Welding Co. to provide a comprehensive cost breakdown for the deployment of a certified Welder team and associated equipment for structural steel fabrication and assembly at the client’s project site in DR Congo Kinshasa. The scope encompasses all labor, consumables, equipment rental, safety compliance, and logistical support required to deliver high-quality welds in accordance with ISO 3834 and AWS D1.1 standards.

The Welder personnel assigned to this project in DR Congo Kinshasa will include two senior arc welders (SMAW and GAW certified), one MIG/TIG specialist, and one welding inspector. All personnel hold valid certifications recognized by the Congolese Ministry of Mines and Industrial Development and possess a minimum of eight years of field experience in tropical and high-humidity environments typical of the Kinshasa region.

Item No. Description Qty Unit (USD) Amount (USD)
01 Senior Arc Welder (SMAW/GAW) — Daily labor rate, DR Congo Kinshasa site 2 × 45 days 185.00 16,650.00
02 MIG/TIG Specialist Welder — Daily labor rate 1 × 45 days 210.00 9,450.00
03 Welding Inspector & Quality Control Technician 1 × 45 days 160.00 7,200.00
04 Welding equipment rental (MIG machines, TIG units, grinders, clamps) 1 set × 45 days 95.00 4,275.00
05 Welding consumables (electrodes, wire, shielding gas, flux) 1 lot 1.00 3,800.00
06 PPE & safety equipment (helmets, gloves, aprons, respirators) 4 sets 120.00 480.00
07 Local transportation & logistics within DR Congo Kinshasa 1 lot 1.00 1,500.00
08 Non-Destructive Testing (NDT) — visual & ultrasonic inspection 1 lot 1.00 2,200.00
09 Project supervision, reporting & documentation 1 lot 1.00 1,800.00
10 Contingency & miscellaneous (10%) 1 lot 1.00 4,735.50
SUBTOTAL (USD) 52,090.50
Applicable Taxes & Levies (DR Congo Kinshasa — 16% TVA) 8,334.48
GRAND TOTAL (USD) 60,424.98
  1. This Quotation Estimate is valid for thirty (30) calendar days from the date of issue. After the expiry date, all pricing, particularly for the Welder labor rates and consumable costs in DR Congo Kinshasa, may be subject to revision due to market fluctuations, fuel price changes, or currency exchange rate adjustments.
  2. Payment terms: 40% advance payment upon acceptance of this quotation, 40% upon completion of 50% of the welding scope, and 20% upon final inspection sign-off and delivery of the completed weld documentation package.
  3. All Welder personnel deployed to the DR Congo Kinshasa site shall comply with local labor regulations, occupational health and safety standards, and the client’s site-specific safety protocols. The client is responsible for providing adequate site access, power supply (380V three-phase), and a safe working environment.
  4. Any change in scope, additional welding hours, or extended project duration beyond the 45-day period outlined in this Quotation Estimate shall be subject to a written change order and additional cost assessment prior to execution.
  5. All welding work performed in DR Congo Kinshasa under this quotation carries a twelve-month workmanship warranty from the date of final acceptance. Defects attributable to the Welder’s technique or material handling shall be rectified at no additional cost to the client.
  6. Disputes arising from this Quotation Estimate shall be resolved through amicable negotiation. In the event of unresolved disagreement, matters shall be referred to the competent commercial courts of Kinshasa, DR Congo.
  7. This document constitutes a firm Quotation Estimate and, upon written acceptance by the client, shall form the basis of a binding service contract between the parties.

By signing below, the client acknowledges and accepts the terms, conditions, and pricing outlined in this Quotation Estimate for the provision of Welder services in DR Congo Kinshasa. The undersigned authorizes Kinshasa Industrial Welding Co. to commence mobilization of personnel and equipment upon receipt of the advance payment.

For: Kinshasa Industrial Welding Co.

______________________________
Name: David Okonkwo
Title: General Manager
Date: _______________
For: Client (CIDG)

______________________________
Name: Jean-Pierre Mbuyi
Title: Project Director
Date: _______________

Quotation Estimate QTE-KIN-2025-0487 — Kinshasa Industrial Welding Co. — DR Congo Kinshasa

This document is confidential and intended solely for the named recipient. Unauthorized reproduction or distribution is prohibited.

⬇️ Download as DOCX Edit online as DOCX

Create your own Word template with our GoGPT AI prompt:

GoGPT
×
Advertisement
❤️Shop, book, or buy here — no cost, helps keep services free.