Quotation Estimate Welder in Uzbekistan Tashkent –Free Word Template Download with AI
Professional Welder Services & Equipment Supply
Uzbekistan Tashkent | Industrial & Construction Sector
Quotation No.: QE-TK-2025-0478Date: 15 June 2025
Valid Until: 15 July 2025 Prepared By: Central Asia Industrial Services LLC
Address: 42 Amir Temur Avenue, Tashkent, Uzbekistan
Contact: +998 71 200 4567 | [email protected] Prepared For: Tashkent Municipal Construction Authority
Project Site: Chilonzor District, Tashkent, Uzbekistan
Reference: TMC-2025-Infra-112
This Quotation Estimate is issued by Central Asia Industrial Services LLC to provide a comprehensive cost breakdown for the procurement, deployment, and operation of a certified Welder and associated welding equipment for the municipal infrastructure rehabilitation project located in Uzbekistan Tashkent. The scope encompasses structural steel welding, pipeline joining, and fabrication work required for the Chilonzor District water distribution network upgrade. This document serves as the formal pricing proposal and shall remain valid for thirty (30) calendar days from the date of issue.
| Item No. | Description | Quantity | Unit | Unit Price (UZS) | Total (UZS) |
|---|---|---|---|---|---|
| 01 | Certified Welder (TIG/MIG/ARC) – Daily Labor Rate, including PPE and certification compliance per Uzbekistan national standards | 45 | Days | 1,250,000 | 56,250,000 |
| 02 | Welding Machine – Inverter MIG/MAG 350A (Brand: Lincoln Electric or equivalent), fully serviced and calibrated | 2 | Units | 18,500,000 | 37,000,000 |
| 03 | Welding Consumables – Electrodes (E6013, E7018), MIG wire (ER70S-6), TIG filler rods, shielding gas (Argon/CO2 mix) for full project duration | 1 | Lot | 12,800,000 | 12,800,000 |
| 04 | Welder Safety Equipment – Welding helmets (auto-darkening), leather gloves, aprons, safety boots, respiratory protection (per OSHA and Uzbekistan labor regulations) | 2 | Sets | 3,200,000 | 6,400,000 |
| 05 | Site Preparation and Welding Fixture Assembly – Clamps, jigs, positioning tables, and workbench setup at the Tashkent project site | 1 | Lot | 7,500,000 | 7,500,000 |
| 06 | Quality Inspection and NDT Testing – Visual inspection, dye penetrant testing, and radiographic testing of all weld joints per GOST 14782 and ISO 5817 standards | 45 | Days | 480,000 | 21,600,000 |
| 07 | Transportation and Logistics – Delivery of Welder, equipment, and consumables from Tashkent warehouse to Chilonzor District site, including return logistics | 1 | Lot | 4,200,000 | 4,200,000 |
| 08 | Project Supervision and Documentation – Daily work logs, weld maps, as-built drawings, and final completion certificate for Uzbekistan Tashkent municipal records | 45 | Days | 350,000 | 15,750,000 |
| SUBTOTAL | 161,500,000 | ||||
| VAT (12% – Uzbekistan standard rate) | 19,380,000 | ||||
| GRAND TOTAL (UZS) | 180,880,000 | ||||
| GRAND TOTAL (USD – approximate at 1 USD = 12,800 UZS) | ≈ 14,131 USD | ||||
The Welder assigned to this project shall hold a valid certification from the Uzbekistan National Welding Council (UzWeld) and possess a minimum of five (5) years of documented experience in structural and pipeline welding. All welding procedures shall comply with the applicable GOST standards in force in Uzbekistan, as well as ISO 3834 for quality management in welding. The Welder will operate exclusively within the designated project boundaries in Tashkent, Uzbekistan, and shall adhere to all local labor laws, safety regulations, and environmental guidelines enforced by the Tashkent City Executive Committee.
All welding equipment listed in this Quotation Estimate shall be new or factory-refurbished units with a minimum twelve-month manufacturer warranty. The Welder will be responsible for daily pre-use inspections, proper storage of equipment, and reporting of any malfunctions to the project supervisor within two (2) hours of detection.
Payment for the services and materials outlined in this Quotation Estimate shall be made in the following installments:
| Milestone | Percentage | Amount (UZS) | Due Date |
|---|---|---|---|
| Contract signing and mobilization | 30% | 54,264,000 | Within 7 days of signing |
| 50% project completion (verified by NDT) | 40% | 72,352,000 | Upon milestone acceptance |
| Final completion and handover | 30% | 54,264,000 | Within 14 days of final inspection |
- This Quotation Estimate is non-binding until formally accepted in writing by the client and countersigned by Central Asia Industrial Services LLC.
- All prices are quoted in Uzbekistan Som (UZS) and are inclusive of all applicable local taxes unless otherwise stated. The USD equivalent is provided for reference only and is subject to exchange rate fluctuations.
- The Welder and all personnel shall be covered under the company's occupational health and insurance policy in accordance with Uzbekistan labor legislation.
- Any change in scope, additional welding hours, or material substitutions must be documented via a formal Change Order signed by both parties before execution.
- Delays caused by force majeure events, government-mandated shutdowns, or client-directed work stoppages shall extend the project timeline without penalty to the contractor.
- The project site is located in Tashkent, Uzbekistan, and all work shall comply with the Tashkent City Building Code and environmental permits held by the client.
- Disputes arising from this Quotation Estimate shall be resolved through arbitration in Tashkent, Uzbekistan, in accordance with the rules of the Tashkent International Arbitration Center.
- Confidentiality: All technical drawings, weld procedures, and project data remain the property of the client and shall not be disclosed to third parties without written consent.
By signing below, both parties acknowledge that this Quotation Estimate accurately reflects the agreed-upon scope, pricing, and terms for the Welder services to be performed in Uzbekistan Tashkent. This document, once executed, constitutes a binding commercial agreement between the parties.
For Central Asia Industrial Services LLCName: _________________________
Title: Project Director
Date: _________________________ For Tashkent Municipal Construction Authority
Name: _________________________
Title: Procurement Officer
Date: _________________________ ⬇️ Download as DOCX Edit online as DOCX
Create your own Word template with our GoGPT AI prompt:
GoGPT